My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-25_REVISION - M1980244 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-10-25_REVISION - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 6:11:59 AM
Creation date
10/25/2019 12:46:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/25/2019
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 2 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> October 24,2019(Revision 1) <br /> 3.4.7. Geomembrane Defects and Repairs................................................................. 14 <br /> 3.4.8. Geomembrane Acceptance.............................................................................. 14 <br /> 4. PROJECT DEVIATIONS ............................................................................................................ 14 <br /> 5. ENGINEER'S OPINION ............................................................................................................ 15 <br /> ISSUED FOR CONSTRUCTION DRAWINGS <br /> AO COVER SHEET <br /> A10 PROJECT SITE PLAN VIEW <br /> A15 PROJECT MATERIAL STOCKPILE AREAS <br /> A20 EXISTING SITE CONDITIONS <br /> A30 HISTORIC UNDERGROUND WORKINGS <br /> A32 TABLE OF HISTORIC UNDERGROUND WORKINGS SHEET 1 OF 3 <br /> A34 TABLE OF HISTORIC UNDERGROUND WORKINGS SHEET 2 OF 3 <br /> A36 TABLE OF HISTORIC UNDERGROUND WORKINGS SHEET 3 OF 3 <br /> A38 UNDERGROUND WORKING REMEDIATION TYPICAL DETAILS <br /> A40 PHASE 2A GRADING PLAN <br /> A42 PHASE 2A PERIMETER ACCESS ROAD PLAN AND PROFILE <br /> A43 PHASE 2A PERIMETER ACCESS ROAD SECTIONS AND DETAILS <br /> A44 PHASE 2B GRADING PLAN <br /> A46 PHASE 2A SQUAW GULCH GRADING PLAN ISOPACH <br /> A48 PHASE 213 SQUAW GULCH GRADING PLAN ISOPACH <br /> A50 OVERALL LINER LIMITS <br /> A60 VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET 1 OF 2 <br /> A62 VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET 2 OF 2 <br /> A64 UNDERDRAIN DETAIL SHEET <br /> A68 LEAK DETECTION & EROSION CONTROL DETAILS <br /> A70 PHASE 2A HIGH VOLUME SOLUTION CONCENTRATION PIPING LAYOUT <br /> A72 PHASE 2B HIGH VOLUME SOLUTION CONCENTRATION PIPING LAYOUT <br /> A74 HIGH VOLUME SOLUTION COLLECTION SYSTEM DETAILS <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\Cert Report-Phase 2A Part 2\DRMS Comments\475.0106.032 CCV PHASE 2A Part 2 <br /> ROC REPORT revl.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.