My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: <br /> Section 4C- Drilling and Blasting <br /> Drilling Blasting <br /> Number of holes drilled idcily) NA Blast area(ecres) NA <br /> Number of holes drilled icnnual) NA Number of blasts(dcilyl NA <br /> Proposed controls for drilling Number of blasts tcnnuct) NA <br /> ❑water infection Type of blasting material NA <br /> ❑Bag collectors Blasting material used(daily) NA <br /> ❑Other(specify) Blasting material used icnnucO NA <br /> Section 4D- Raw Material <br /> Removal Stockpile(s) <br /> Material removed daily(tons) 4,800 Maximum stored on site(tonsl 10,000 <br /> Material removed annual itons) 1,250,000 Proposed control for raw material stockpile <br /> Maximum drop height(feet) 6 d❑watering <br /> Specific moisture content(°:) 0_3 ❑Chemical stabilizer <br /> Proposed controls for raw material removal ❑Compacting of piles <br /> ❑Moist material ❑Enclosures ichcose one option from below) <br /> ❑✓ water spray ❑Complete ❑Partial <br /> ❑Other(specify) ❑Other(specifyt <br /> Section 4E- Conveyors and Transfer Points(not assigned to process eauipmencl <br /> Include a map detailing the conveyor system layout within the site. <br /> Conveying Transfer Points <br /> Material conveyed daily irons) NA Number of transfer <br /> points NA <br /> Material conveyed annual irons) NA Proposed controls for transfer points <br /> Proposed controls for conveyors ❑watering <br /> ❑Enclosures!choose ene option from below) ❑Chemical stabilizer <br /> ❑Complete ❑Partial ❑Enclosures(choose one option from below) <br /> [:]Other ispecifyf ❑Complete ❑Partial <br /> ❑Other(specify) <br /> _ 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.