My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: <br /> Section 4 - Processing/Manufacturing Information Ft Material Use <br /> ❑Check this box if APEN is for Haul Roads only(not located at a mining site) and complete the applicable <br /> sections, Section 4H- Raw Material Trans ort and/or Section 41- Finished Product Transport on pages 6 and 7. <br /> Otherwise complete all of Section 4. <br /> Frorn what year is the actual annual amount! "'%%ne <br /> Actual Annual Production(tons) <br /> Requested Annual Productions(rom) 1,250,000 tons per year <br /> 5 Requested values will become permit limitations. Requested limits)should consider future process growth. <br /> Section 4A-Topsoil <br /> Removal Stockpile(s) <br /> Topsoil removed daily(tonsi Maximum stored on site(tonsi <br /> Topsoil removed annual itoosi Proposed controls for topsoil stockpile <br /> Proposed controls for topsoil removal I ❑J Vatering <br /> ❑Moist.Material ❑Chemical Stabilizer <br /> ❑✓ Water Spray ❑✓ Compacting of Piles <br /> ❑Other(specify) ❑Enclosures(chcose one option from belcwl <br /> ❑Complete ❑Partial <br /> ❑✓ Revegetation!must occur within one year of site disturbance) <br /> ❑Other(specify) <br /> Section 4B-Overburden <br /> Removal Stockpile(s) <br /> Equipment used for removal Excavator,Dozer,Haw Truck Maximum stored on site Itonsl <br /> Tons removed by draghne(daily) NA Proposed controls for overburden stockpile <br /> Tons removed by dragline(annual)NA ❑Watering <br /> Dragline drop height!feet) NA [:]Chemical stabilizer <br /> Hours scraper operated(daily) NA ❑✓ compacting of piles <br /> Hours scraper operated tannuall NA ❑Enclosures(choose one option from below) <br /> Proposed controls for overburden removal ❑Complete ❑Partial <br /> ❑Moist material ❑Revegetation(must cccur within one year of site disturbance! <br /> ✓❑Water Spray ❑Other,specify( <br /> ❑Other(specify) <br /> Form APCD•22? -Mining Operations APEN Revt-101. ?l't:1 3 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.