My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-08_PERMIT FILE - M2019054 (48)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019054
>
2019-10-08_PERMIT FILE - M2019054 (48)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 5:09:01 AM
Creation date
10/9/2019 2:18:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019054
IBM Index Class Name
PERMIT FILE
Doc Date
10/8/2019
Doc Name Note
Part 2 of 5
Doc Name
Application
From
Uinta Mining, LLC
To
DRMS
Email Name
SJM
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit Number: AIRS ID Number: 1 / <br /> (Leave blank unless APCD has already assigned a(;Limit=and AIRS ID; <br /> Section 4F- Processing,Equipment <br /> Will processing(i.e., crushing, screening, etc.)occur on site? (yes/no) yes <br /> If you answered "No"above(i.e. no processing/manufacturing equipment will be located on site)check the box <br /> below and skip to page 6, Section 4G- Finished Product. <br /> ❑Check this box if no process equipment is located on site. <br /> List any additional emission sources and related controls(e.g. concrete batch plants, crushers/screens, engines, <br /> conveyors and transfer points associated with process equipment, asphalt plants, etc.). Additional APENs for any <br /> such equipment may be required. The following specialty APENs are available: Form APCD-224 Concrete Batch <br /> Plant APEN, Form APCD-221 Crusher/Screen APEN, Form APCD-233 Compression Ignition Engine APEN. If a specialty <br /> APEN is not appropriate for the additional equipment, use Form APCD-200 General APEN. <br /> Additionally,complete the section below regarding crushing and screening performed on site. <br /> Emission Source Control Equipment Description Permit Number <br /> (or equipment type) (if available) <br /> Feeder Breaker (Crusher) <br /> 236 Hp Generator <br /> Primary Crushing Screening/Classifying <br /> Maximum crushed per year(tons) 1,250,000 Maximum screened per year itonsi NA <br /> Design process rate(tons/hour' 1,000 I Design process rate)tons/hour) NA <br /> Duration of daily crushing(hours) 24 Duration of daily screening(hours) <br /> Secondary Crushing I Secondary Screening/Classifying <br /> Maximum crushed per year(tans) NA Maximum screened per year rtcns) NA <br /> Design process rate(tons)hour) NA Design process rate(tons)hour) NA <br /> Proposed control for crushing Proposed control for screening <br /> ❑Moist material ❑Moist material <br /> I <br /> ❑Water spray ❑Water spray <br /> ❑Enclosures(choose one option from below) ❑Enclosures(choose one option from below) <br /> ❑Complete ❑Partial ❑Complete ❑Partial <br /> ❑Other(specifyi ❑Other(specify) <br /> Note: Completion of this section does not relieve the applicant from the requirement to submit APEN forms for <br /> process equipment subject to APEN or permitting requirements. <br /> ®® COLCHA DO <br /> Form APCD 222 ,Hiving Operations APEN - Revision s:2015 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.