My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-30_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-09-30_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 5:00:09 AM
Creation date
10/8/2019 3:23:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
9/30/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR118
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation ■• <br /> Cripple Creek&Victor Gold Mine ■ <br /> VLF2 Phase 2 CQA <br /> NewFields Job No.475.0106.032 <br /> Week Ending Saturday,June 8,2019 <br /> 1.5 Leak Detection Trench <br /> The leak detection trench was repaired along the designated areas. Repairs were performed <br /> according to the project construction drawing detail. A mini-excavator and skid steer were <br /> used to place drain cover fill (DCF) material over the trench as a protective layer. NewFields <br /> personnel monitored the repair activity. <br /> 2.0 GEOSYNTHETICS <br /> 2.1 Geomembrane Installation <br /> Geomembrane installation continued within the Phase 2A limits shown on Figure 4. <br /> Approximately 101,114 square feet (P-2514 to P-2545) of 80 mil LLDPE (double sided texture) <br /> was deployed. Subgrade was inspected and approved by NewFields, Tezak, Newmont, and <br /> Tetra Tech representatives prior to geomembrane deployment. Approximately 4740 linear feet <br /> of seam was fusion welded using two fusion welding machine/operator combinations. Ten <br /> destructive testing samples were marked during fusion seaming. Approximately 262 linear feet <br /> of seam was extrusion welded using one extrusion welding machine/operator combination. <br /> Two destructive testing samples were marked during extrusion seaming. All destructive tests <br /> performed met project specifications. Non-destructive testing was performed for fusion <br /> welded seams. Repairs were performed using the extrusion welding method for all marked <br /> defects. Vacuum testing was performed for all extrusion welded seams and repairs. <br /> 2.2 Geomembrane Exposure <br /> No activity during this reporting period <br /> 2.3 Anchor Trench <br /> Approximately 400 feet of anchor trench was excavated in accordance with construction <br /> drawings, project technical specifications, and RFIs. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.