My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-10-01_REVISION - M2019028
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019028
>
2019-10-01_REVISION - M2019028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:09:55 PM
Creation date
10/1/2019 1:15:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
REVISION
Doc Date
10/1/2019
Doc Name
Adequacy Review Response #2
From
J & T Consulting
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J&T Consulting, Inc. J-2 Contracting Company <br /> 1 <br /> OPG Pit <br /> 9/272019 <br /> Reclamation Bond Quantities and Costs <br /> 0 2019 IaT CenealoN Inc. let 14 DPG I'd Re.Bond Cal" <br /> Phaao 2 a 16.64 mores(Mining Limits) <br /> lReclamation operation Quantity Unit Unit Cost st <br /> Slurry Wall for Phase 2 3,021 A $ 425.00 1,283,925 <br /> Scarifying-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 24.08 ac $ 200 $ 4,816 <br /> Topsoil Placement-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 24.08 ac $ 1,800 $ 43,344 <br /> Revegetate-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 24.08 ac $ 1,000 $ 24,080 <br /> Riprap Spillway Construction for Phase 2 3,116 <br /> Dewatering of Pit for Phase 2 cY $ 54•00 $ 1 , <br /> Mobilization 322.00 mg $ 400 $ 1288, 00 800 <br /> 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 1,655,747 <br /> Overhead and Profit Cost(12.60%) $ 208,624 <br /> ontrad ostT 1,8 , 1 <br /> Project Management(9.25%) $ 172,454 <br /> Additlonal Financial Warranty Required For Phases 2 $ 2,036825 <br /> Cummulative Financial Warranty R uired For Phase 1-2 $ 2.840.237 <br /> Phaam 3.66.66aores(Mining Limits) <br /> lReclamation Operation Quantity Unit Unit Cost ost <br /> Slurry Wall for Phase 3 5,546 If $ 360.00 $ 1,996,560 <br /> Scarifying-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 48.70 ac $ 200 $ 9,740 <br /> Topsoil Placement-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 48.70 ac $ 1,800 $ 87,660 <br /> Revegetate-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 48.70 ac $ 1,000 $ 48,700 <br /> Riprap Spillway Construction for Phase 3 10,857 <br /> 586,269 <br /> Dewatering of Pit for Phase 3 960.00 cY $ 54 00 $ 384 <br /> Mobilization mg $ 400 $ , 00 0 <br /> 00 <br /> 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 3,115,429 <br /> Overhead and Prord Cost(12.60%) $ 392,544 <br /> Contract Cost $ 3,507,973 <br /> Project Management(9.25%) $ 324,488 <br /> Additlona/Financial Warranty Required For Phase 3 $ 3 832 461 <br /> Cummulative Financial Warranty Required For Phase 1-3 $ 6,672.698 <br />
The URL can be used to link to this page
Your browser does not support the video tag.