Laserfiche WebLink
J&T Consulting, Inc. J-2 Contracting Company <br /> FR'.1amation DPG Pit <br /> 9/272019 <br /> d Quantities and Costs <br /> ultlnr.Iae. 18114 DPG PR Ree Bond Calm <br /> Phaaa 4•"A aCf O*(Mining Limits) <br /> lReclarnation Operation Quantity UnitUnit Cost st <br /> Slurry Wall for Phase 4 5,917 9 $ 542.00 3,207,014 <br /> Scarifying-Disturbed Areas-Phase 4 Mining Limits outside stockpile processing area to permit boundary 40.43 ac $ 200 $ 8,086 <br /> Topsoil Placement-Disturbed Areas-Phase 4 Mining Limits outside stockpile processing area to permit boundary 40.43 ac $ 1,800 $ 72,774 <br /> Revegetate-Disturbed Areas-Phase 4 Mining Limits outside stockpile processing area to permit boundary 40.43 ac $ 1,000 $ 40,430 <br /> Riprap Spillway Construction for Phase 4 21,389 Cy $ 54.00 $ 1,155,012 <br /> Dewatering of Pit for Phase 4 808.00 mg $ 400 $ 323,200 <br /> Mobilization 1.0 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 4,809,016 <br /> Overhead and Profit Cost(12.6090) $ 605,936 <br /> ontract ost 5,414,952 <br /> Project Management(9.25%) $ 500,883 <br /> 1ddltiona/Financial Warranty Required For Phase 4 $ 5,915 835 <br /> Cummuladve Financial Warranty Required For Phase 1-4 $12 588 533 <br /> Phase S•46A J1110M:(Mining Limits) <br /> ec amation Operation uant nit Unit Cost Cost <br /> Slurry Wall for Phase 5 4,039 9 $ 190.00 $ 767,410 <br /> Scarifying-Disturbed Areas-Phase 5 Mining Limits outside stockpile processing area to permit boundary 33.76 ac $ 200 $ 6,752 <br /> Topsoil Placement-Disturbed Areas-Phase 5 Mining Limits outside stockpile processing area to permit boundary 33.76 ac $ 1,800 $ 60,768 <br /> Revegetate-Disturbed Areas-Phase 5 Mining Limits outside stockpile processing area to permit boundary 33.76 ac $ 1,000 $ 33,760 <br /> Riprap Spillway Construction for Phase 5 27,739 Cy $ 54.00 $ 1,497,909 <br /> Dewatering of PH for Phase 5 685.00 mg $ 400 $ 274,000 <br /> Mobilization 1.0 Is $ 2,500 $ 2,5W <br /> Total Direct Cost $ 2,643,099 <br /> Overhead and Profit Cost(11 % $ 333,030 <br /> Contrail ost , 9 <br /> Project Management(9.25%) $ 275,292 <br /> Additional Financial Warranty Required For Phase 5 $ 3,251421 <br /> Cummuladve Financial Warranty Required For Phase 1-5 $15,839,954 <br />