Laserfiche WebLink
Cost Summary 1orksheet Cont'd Task Page 10 of 1 <br /> BULLDOZER WORT <br /> Task description: Kin I-re grade ' growth medium on Waste Bank Expansion <br /> Site: King Coal Mine Permit Action: TR27 Permit Job#: C19 1 3 <br /> PROJECT IDENTIFICATION <br /> Task##: 004 State: Colorado Abbreviation: Done <br /> m. <br /> 04 <br /> Date: 9 16/2019 County: La Plata Filenarr�e: C 3 -0 <br /> User: ITT' <br /> Agency or organization name: DRMS <br /> HOURLY UIPMENT COST <br /> Basic Machine: Cat D T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ri er <br /> Shift Basis: 1 erda <br /> Data Source: CRG <br /> Cost Breakdown: <br /> Utilization <br /> Ownership Cost Hour; $103. 6 NA <br /> Operating Cost/Hour: $ 2.26 1 <br /> 00 <br /> Ripper own. $10.43 NA <br /> Cost/Hour: <br /> Ripper op.Cost 14our: $0.0 <br /> Operator Cost/Hour: $41.24 <br /> Total unit Cost/Hour: $237.79 <br /> Total Fleet Costour: $ 37.7 <br /> MATERIAL OUANTITIES <br /> InitialVolume: 2,13 <br /> Swell factor: 1.00 <br /> Loose volume: 2 139 LC <br /> Source of estimated volume: 2.6 acres, "depth <br /> Source of estimated swell Gat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 852.6 LC /hr <br /> production: <br /> Materials consistency Loose stockpile 1.2 <br /> description: <br /> Average push -10% <br /> gradient: <br /> Average site altitude: 7,400 feet <br /> Material weight: 2,900 lbs/LC <br /> CIRCES Cost Estimating Software <br />