Laserfiche WebLink
Cost Summary Worksheet Cont'd Task#000 Page 9 of 1 <br /> Weight description: Decomposed rock- 0%Rock,m %Earth <br /> Job Condition Correction Factor Source <br /> Operator Shill: 0. 0 A . <br /> Material consistency: 1.200 (CAT HB <br /> Dozing method: 1.000 GEN.) <br /> Visibility: 1. 00 A . <br /> Job efficiency: 0. 30 1 SHIFTIDA <br /> Spoil pile: 0,900 (FIND-IMF) <br /> Push gradient: 1.22 (CAT SIB) <br /> Altitude: 1.000 (CAT 1 <br /> Material eight. 0.793 (CAT H <br /> Blade type: 1.00 (PAT) <br /> Net correction: 0.5805 <br /> Adjusted unit 494.93 LC Ihr <br /> production: <br /> Adjusted fleet 494.93 LC7hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size. 1 Dozer(s) <br /> Unit cost: $0.4801LCY <br /> Total job time: _29.75 Hours Total,job cost: $7,074 <br /> CIRCES Cost Estimating Software <br />