My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-17_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2019-09-17_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:02:54 PM
Creation date
9/17/2019 11:32:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/17/2019
Doc Name
Interoffice Memo/Review Memo
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
TR27
Email Name
RDZ
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task#000 Page 8 of 1 <br /> BULLDOZER WORK <br /> Task description: _King I-r gr de 3. 'of cover on Waste Bank Expansion <br /> Site: Kin Coal Mine Permit Action: TR27 Permit]ob#: C 19 103 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: Done <br /> Date: 9 1 / 01 Counter: La Plata Filename: C 3 - 03 <br /> User: Z!"! <br /> Agency or organization name: 1 R i <br /> HOURLY E UIPMENT COST <br /> Bane Machine: Cat D8 T-8SU <br /> Horsepower., 310 <br /> Blade Type: Semi-Universal <br /> Attachment: 3-shank ri er <br /> Shift Basis. 1 er da <br /> Data Source: CR <br /> Cost Breakdown: <br /> [utilization <br /> Ownership o tli our: $103-86 IAA <br /> Operating Cost Hour: $82.26 100 <br /> Ripper own. $10. 3 IAA <br /> Cost/Hour: <br /> Ripper op.Cost Hour: $0.0 <br /> Operator Cost/Hour: $41.24 IAA <br /> Total unit Cost/Hour: $ 37. 9 <br /> Total Fleet CostHour: $237.79 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 14,723 <br /> Swell factor: 1.000 <br /> Loose volume: 1 ,73 LCY <br /> Source of estimated volume: 2.6 acres,3. 'de th <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 852.E LCY hr <br /> production: <br /> Materials consistency Loose stockpile 1. <br /> description: <br /> Average push -10% <br /> gradient: <br /> Average site altitude: 7,400 feet <br /> Material weight: 900 sIL Y <br /> CIRCES Cost Estin rating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.