My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-09-17_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2019-09-17_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:02:54 PM
Creation date
9/17/2019 11:32:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
9/17/2019
Doc Name
Interoffice Memo/Review Memo
From
Zach Trujillo
To
Rob Zuber
Type & Sequence
TR27
Email Name
RDZ
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet ont'd Task #000 Page 7 of 1 <br /> Truck Travel(Haul&return)Time: RoadCondition: Rutted dirt,little maintenance, no water,2"tire <br /> penetration 5.0 <br /> Haul route: <br /> eg# Haul Distance Grade % boll. Res Total Res velocity Travel <br /> Ft M M fpm Tine <br /> min <br /> 1 2 -10.00 5.00 -5.00 2938 0.732 <br /> Haul Time: 0.732 minutes <br /> Return Route: <br /> eg# Haul Distance Grade % boll. Res Total Res Velocity Travel <br /> Ft M M (rpm) Time <br /> mi r <br /> 1 2000.00 10.00 .0 15.00 rI 178 1.70 <br /> Return Time: 1,702 minutes <br /> Total Truck Cycle Time: ,71 � minutes <br /> Loading'Tool unit <br /> Production 494.1 L Y Hour Adjusted for job efficiency: 410.1 L Y Hour <br /> Truck Unit Production <br /> 145.04 L Y Hour Adjusted for job efficiency: 120.38 L Y/Hour <br /> Optimal No.of Trucks; 3 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 240.77 L Y Hour <br /> Adjusted single truck loader team production: 240.77 L YIHour <br /> Adjusted multiple truck loader team production: 240,77 L YIHour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) 'Total job time: 10.35 Hours <br /> Unit cost: $0.967 ILLY Total job cost: 2 1 <br /> IRE.S Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.