Laserfiche WebLink
Cost Summary Worksheet ont'd Task#00 Page 11 of 1 <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Materialconsistency: 1.200 (CAT HB <br /> Dozing method; 1.00 EN. <br /> Visibility: 1.000 AV • <br /> Job efficiency: 0.830 1 SHIFT/DAY) <br /> Spoil pile: 0.600 FND-SF <br /> Push gradient: 1. 25 (CAT 1 <br /> Altitude. 1.000 (CAT H.13 <br /> Material Weight. 0.793 (CAT H <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4354 <br /> Adjusted unit 371. LC hr <br /> production: <br /> Adjusted fleet 71.22 LC /hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer <br /> [knit cost: $0.641/LC <br /> Total,jab time: 5.76 Hours <br /> Total job cost: 1 74 <br /> CItCES Cost Estimating Software <br />