Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material W eight: <br />Blade type: <br />Source <br />0.750 (A -v <br />0.900 (CAT <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4668 <br />Adjustedunit 2,142.38 LCY/hr <br />production: <br />Adjustedfleet 2142.38 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.211/LCY <br />Total job time: 1.27 Hours <br />Totaljob cost: $575 <br />Page 59 of 115 <br />CIRCES Cost Estimating SoBware <br />