My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 10:10:03 AM
Creation date
9/11/2019 9:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 58 of 115 <br />BULLDOZER WORK <br />Task description: Regrade Ditch D4 <br />Site: Col owyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 028 State: Colorado Abbreviation: None <br />Date: 5/16/2018 County: Moffat Filename: C019-028 <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD11T - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,726 <br />Swell factor: 1.000 <br />Loose volume: 2,726 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Fath. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush dis tance: <br />Unadjusted hourly <br />production: <br />50 feet <br />4,589.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />0% <br />7,500 feet <br />2,650 lbs/LCY <br />Weight description: Decom4)osedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Solware <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 1 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 2,726 <br />Swell factor: 1.000 <br />Loose volume: 2,726 LCY <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Fath. 7 -item 23, Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush dis tance: <br />Unadjusted hourly <br />production: <br />50 feet <br />4,589.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />0% <br />7,500 feet <br />2,650 lbs/LCY <br />Weight description: Decom4)osedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Solware <br />
The URL can be used to link to this page
Your browser does not support the video tag.