Laserfiche WebLink
Page 60 of 115 <br />BULLDOZER WORK <br />Task description: Regrade Ditch D5 <br />Site: Colowyo Coal Mne Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 029 State: Colorado <br />Date: 5/16/2018 County: Moffat <br />User: ZTT <br />Agency or organizationname: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />CatD11T - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis : <br />Iffier day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />Utilization % <br />$226.13 NA <br />$183.90 100 <br />$0.00 NA <br />$41.85 1 NA <br />Abbreviation: None <br />Filename: C <br />MATERIAL QUANTITIES <br />Initial Volume: 6,717 <br />Swell factor: 1.000 <br />Loose volume: 6,717 LCI' <br />Source ofestimatedvolume: Exhibit 7-23B, Table 1, Exh. 7 -item 23, Fig. B-1 <br />Source ofestimated swell, Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 4,589.5 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />7,500 feet <br />2,650 lbs/LEY <br />Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Solwaie <br />