Laserfiche WebLink
Job Condition CorrectionFactor <br />Source <br />Operator Skill: <br />1.000 <br />EXCL.) <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />(AVG <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DA <br />Spoil pile: <br />0.900 <br />(SSD -FC) <br />Push gradient <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5836 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />1,498.74 LCY/hr <br />1498.74 LCY/hr <br />Fleetsize: 1 Dozer(s) <br />Unit cost: 0.302/LCY <br />Totaljob time <br />Totaljob cost <br />4.95 Hours <br />$2,239 <br />Page 39 of 115 <br />CIRCES Cost Estimatmg So$ware <br />