My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-31_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2019-05-31_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 10:10:03 AM
Creation date
9/11/2019 9:50:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
5/31/2019
Doc Name
Cumulative Bond Schedule
Section_Exhibit Name
Exhibit 13C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Taskdescription: Mddle Pond Removal <br />Site: Colowyo Coal Mne <br />PROJECT IDENTIFICATIOl\ <br />Task#: 018 <br />Date: 5/16/2018 <br />User: ZTT <br />Page 38 of 115 <br />Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPNIINT COST <br />Basic Machine: <br />CatD11T - llU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />ShiftBasis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 6,600 <br />Swell factor: 1.125 <br />Loose volume: 7,425 LCY <br />Source ofestimatedvolume: Exh 7,Item 23,Fig. C8 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />115 feet <br />2,568.1 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Sofware <br />Utilization % <br />$226.13 <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />Total Fleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 6,600 <br />Swell factor: 1.125 <br />Loose volume: 7,425 LCY <br />Source ofestimatedvolume: Exh 7,Item 23,Fig. C8 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />115 feet <br />2,568.1 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Sofware <br />
The URL can be used to link to this page
Your browser does not support the video tag.