Laserfiche WebLink
1:i I100014Y�I�:a.�L�7:7:� <br />Task description: Section 36 Pond Removal <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Task#: <br />019 <br />Date: <br />5/16/2018 <br />User: <br />ZTT <br />Page 40 of 115 <br />Permit Action: 13C (RN7) Permit/Job#: C1981019 <br />State: Colorado Abbreviation: None <br />County: Moffat Filename: C <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CatD11T - 11U <br />Horsepower: 850 <br />Blade Type: Universal <br />Attachment: NA <br />Shift Basis: 1 perday <br />Data Source: (CRG) <br />Cost Breakdown: <br />Total unit Cost/Hour: $451.88 <br />TotalFleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 5,700 <br />Swell factor: 1.125 <br />Loose volume: 6,413 LCY <br />Source o fes timated volume: Exh 7,Item 23,Fig. C7 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />2,036.8 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Sotware <br />Utilization % <br />Ownership Cost/Hour: <br />$226.13 <br />NA <br />Operating Cost/Hour: <br />$183.90 <br />100 <br />Ripper own. <br />$0.00 <br />NA <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />TotalFleet Cost/Hour: $451.88 <br />MATERIAL QUANTITIES <br />Initial Volume: 5,700 <br />Swell factor: 1.125 <br />Loose volume: 6,413 LCY <br />Source o fes timated volume: Exh 7,Item 23,Fig. C7 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />2,036.8 LCY/hr <br />Materials consistency description: Compacted fill orembankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Material weight: <br />Weight description: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Decomposedrock-25% Rock, 75% Earth <br />CIRCES Cost Estimating Sotware <br />