Doc Name
Adequacy Review Response
From
J&T Consulting
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: J-2 Contracting Company—DPG Pit—Permit No. M-2019-028 <br /> 112(c)Permit Application <br /> Adequacy Review No. 1 Response 8126119 <br /> -7- <br /> 26) The reclamation plan maps submitted in Exhibit F show four different types of riprap lined <br /> spillways (A-D) proposed to be installed on the reservoirs for reclamation. Please provide <br /> details on these proposed structures in Exhibit E, including an explanation for the different <br /> types, number, and locations proposed. The operator could always revise the proposed <br /> inlet/outlet structures at a later date through submittal of a Technical Revision, once the <br /> operational criteria for the reservoirs have been identified. However, the Division must hold <br /> bond costs for installing the proposed inlet/outlet structures, at a minimum, on the <br /> reservoir(s) to be mined within the proposed maximum disturbance scenario. Therefore, <br /> sufficient details for these structures must be provided to calculate the required financial <br /> warranty. <br /> Response: The design information for the spillways has been included in the attached <br /> information. The spillways were designed per the Urban Drainage and Flood Control <br /> District's Technical Review Guidelines for Gravel Mining and Water Storage Activities <br /> Within or Adjacent to 100-Year Floodplains. Details of the proposed spillways have been <br /> provided with the Exhibit F reclamation plans and updates to the Exhibit L bond <br /> calculations have been provided for the spillway construction cost for each phase of <br /> mining. <br /> 27) Please provide more details on reclamation of any recharge pond areas and sediment <br /> control structures, including the approximate volume of backfill material required. <br /> Additionally, please be sure any costs for reclaiming these features are included in the <br /> Exhibit_L bond estimate. <br /> Response: The recharge pond area is already an existing feature so the reclamation cost <br /> for the recharge pond will only be re-seeding this area. The re-seeding cost has been <br /> provided in the revised Exhibit L bond calculations. The sediment ponds are above grade <br /> and will require removal of the berms and sediment within the ponds and costs are <br /> included in the revised Exhibit L bond calculations. <br /> 28) Please provide details on reclamation of the dewatering pipe shown on the Exhibit C-4 — <br /> Mining Plan Map. Additionally, please be sure any costs for reclaiming this feature are <br /> included in the Exhibit L bond estimate. <br /> Response: The dewatering pipe is going to be lay flat hose so it will not be buried. The <br /> overflow pipe from the recharge pond to the river will be buried and costs to reclaim the <br /> pipe have been included in the revised Exhibit L bond calculations. <br /> 29) Please provide details on reclamation of the proposed aggregate processing plant and <br /> concrete and asphalt batch plant. Will any structures (e.g., concrete foundations, <br /> buildings) require demolition for reclamation? Please be sure any costs for reclaiming <br /> these features are included in the Exhibit L bond estimate. <br /> Response: The aggregate processing plant, asphalt batch plant, and concrete batch <br /> plant are all portable so there are not any concrete foundations proposed for these <br /> facilities. There will not be any reclamation needed for the structures other than re- <br /> seeding these areas if the mining stops. If mining continues the areas where the plants <br /> would be located eventually get mined out. <br /> 30) Please provide details on reclamation of the proposed truck scale and scale house. Will <br /> any structures (e.g., concrete foundations, buildings) require demolition for reclamation? <br /> Please be sure any costs for reclaiming these features are included in the Exhibit L bond <br /> estimate. <br /> Response: The scale and scale house foundations will require demolition for the <br /> 4r, 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax:303-857-6224 <br />
The URL can be used to link to this page
Your browser does not support the video tag.