Laserfiche WebLink
RE: J-2 Contracting Company—DPG Pit—Permit No. M-2019-028 <br /> 112(c) Permit Application <br /> Adequacy Review No. 1 Response 8126119 <br /> -8- <br /> reclamation. The revised Exhibit L bond calculations include these costs. <br /> 31) The proposed temporary stockpile seed mix includes Crested wheatgrass. While this <br /> grass species can be helpful for quick stabilization, it is not compatible with native grasses. <br /> If used for topsoil stabilization, this species would become part of the topsoil seedbase <br /> and potentially interfere with the growth of desired native grasses when the topsoil is used <br /> for reclamation. Please remove this species from the temporary stockpile seed mix, or <br /> replace it with a species that is more compatible with native grass species. <br /> Response: The temporary stockpile seed mix has been revised to remove crested <br /> wheatgrass. <br /> 32) Please provide the expected time of year for reclamation seeding. <br /> Response: The reclamation seeding will be completed per CDOT's requirements that <br /> state seeding can occur anytime after spring thaw until June 1st and from September 15"' <br /> until there is a consistent ground freeze. <br /> Exhibit F— Reclamation Plan Map (Rule 6.4.6): <br /> 33) Exhibits F-1 and F-2 Reclamation Plan Maps do not show any roads to remain around the <br /> reservoirs for reclamation. Does the operator propose leaving any roads within the <br /> affected lands for reclamation? If not, how will the proposed reservoirs be accessed for <br /> maintenance? Please be sure to show on the reclamation plan maps any roads to remain <br /> for reclamation. <br /> Response: The reclamation plan maps have been updated to show the access roads that <br /> will remain around the perimeter of the reservoirs. <br /> 34) Exhibits F-1 and F-2 Reclamation Plan Maps identify the location of a "Floodway" and a <br /> "Floodplain" for the Cache La Poudre and South Platte Rivers. Please specify the type of <br /> floodway and floodplain on these maps (e.g., 100-year, 500-year). <br /> Response: The The floodway and floodplain locations have been labeled to specify that <br /> they are the 100 year floodway and floodplain as designated from the CHAMP study that <br /> is being conducted for this area. <br /> Exhibit G —Water Information (Rule 6.4.7): <br /> 35) Please provide a stormwater management plan for the proposed operation. <br /> Response: J-2 Contracting Company commits to providing a stormwater management <br /> plan for the proposed operation when they apply for the stormwater/dewatering permit <br /> from CDPHE. This permit will be required but J-2 Contracting Company will not apply for <br /> this permit until they are certain they will receive approval from Weld County for a Use by <br /> Special Review permit. J-2 Contracting Company commits to utilizing best management <br /> practices for all sediment traps, sediment ponds, erosion control measures, etc. to <br /> ensure that sediment transport is minimized and contained within the area of the <br /> operation and stormwater management plan. A stormwater management plan will be <br /> provided to the DRMS once J-2 Contracting Company finalizes it specific to this <br /> operation. <br /> 36) The proposed lined reservoirs are located within the 100-year flood plain of the nearby <br /> rivers. Therefore, please provide a flood analysis and control plan addressing how the <br /> operation will safely convey the expected 100-year flood event throughout the life of mine, <br /> R I 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax: 303-857-6224 <br />