My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-29_PERMIT FILE - M2019028 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019028
>
2019-08-29_PERMIT FILE - M2019028 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2025 4:08:54 AM
Creation date
8/30/2019 11:33:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019028
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2019
Doc Name
Adequacy Review Response
From
J&T Consulting
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J-2 Contracting Company <br /> J&T Consulting, Inc. <br /> DPG Poi <br /> 8/26I2019 <br /> Reclamation Bond Quantities and Costs <br /> ©2019 J!T Consulthm Inc. 18114 DPG Pit Rec Bond CaI <br /> Phase 2- 19.94 acres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 2 3,021 If $ 42500 $ 1,283,925 <br /> Scarifying-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 2408 ac $ 200 $ 4,816 <br /> Topsoil Placement-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 2408 ac $ 1,800 $ 43,344 <br /> Revegetate-Disturbed Areas-Phase 2 Mining Limits and to Permit Boundary 2408 ac $ 1,000 $ 24,080 <br /> Riprap Spillway Construction for Phase 2 3,116 cy $ 5400 $ 168,282 <br /> Dewatering of Pit for Phase 2 32200 mg $ 400 $ 128,800 <br /> Mobilization 10 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 1,655,747 <br /> Overhead and Profit Cost(12 60%) $ 208,624 <br /> Contract Cost $ 1,864,371 <br /> Project Management(9 25%) $ 172,454 <br /> Additional Financial Warranty Required For Phases 2 $ 2,036,825 <br /> Cummulative Financial Warranty Required For Phase 1-2 $ 2,837,432 <br /> Phase 3-55.69acres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 3 5,546 If $ 36000 $ 1,996.560 <br /> Scarifying-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 4870 ac $ 200 $ 9,740 <br /> Topsoil Placement-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 4870 ac $ 1,800 $ 87,660 <br /> Revegetate-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 4870 ac $ 1,000 $ 48,700 <br /> Riprap Spillway Construction for Phase 3 10,857 cy $ 5400 $ 586,269 <br /> Dewatering of Pit for Phase 3 96000 mg $ 400 $ 384,000 <br /> Mobilization 10 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 3,115,429 <br /> Overhead and Profit Cost(12 60%) $ 392,544 <br /> Contract Cost $ 3,507,973 <br /> Project Management(9 25%) $ 324,488 <br /> Additional Financial Warranty Required For Phase 3 $ 3,832,461 <br /> Cummulative Financial Warranty Required For Phase 1-3 $ 6,669,893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.