Laserfiche WebLink
J&T Consulting, Inc. J-2 Contracting Company <br /> DPG Pit <br /> In 8/26/2019 <br /> Reclamation Bond Quantities and Costs <br /> ©2019 J&T Coundtlim Inc. 18114 DPG Pit Rec Bond Calmll <br /> Phase 4•44.1 aeres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 4 5,917 If $ 54200 $ 3,207,014 <br /> Scarifying-Disturbed Areas-Phase 4 Mining Limits outside stockpile processing area to permit boundary 4043 ac $ 200 $ 8,086 <br /> Topsoil Placement-Disturbed Areas-Phase 4 Mining Limits outside stockpile processing area to permit boundary 4043 ac $ 1,800 $ 72,774 <br /> Revegetate-Disturbed Areas-Phase 4 Mining Limits outside stockpile processing area to permit boundary 4043 ac $ 1,000 $ 40,430 <br /> Riprap Spillway Construction for Phase 4 21,389 cy $ 5400 $ 1,155,012 <br /> Dewatering of Pit for Phase 4 80800 mg $ 400 $ 323,200 <br /> Mobilization 10 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 4,809,016 <br /> Overhead and Profit Cost(12 60%) $ 605,936 <br /> Contract Cost $ 5,414,952 <br /> Protect Management(9 25%) $ 500,883 <br /> Additional Financial Warranty Required For Phase 4 $ 5,915,835 <br /> Cummulative Financial Warranty Required For Phase 1-4 $12,585,728 <br /> Phase 5•45.4 aores(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 5 4,039 If $ 19000 $ 767,410 <br /> Scarifying-Disturbed Areas-Phase 5 Mining Limits outside stockpile processing area to permit boundary 3376 ac $ 200 $ 6,752 <br /> Topsoil Placement-Disturbed Areas-Phase 5 Mining Limits outside stockpile processing area to permit boundary 3376 ac $ 1,800 $ 60,768 <br /> Revegetate-Disturbed Areas-Phase 5 Mining Limits outside stockpile processing area to permit boundary 3376 ac $ 1,000 $ 33,760 <br /> Riprap Spillway Construction for Phase 5 27,739 cy $ 5400 $ 1,497,909 <br /> Dewatering of Pit for Phase 5 68500 mg $ 400 $ 274,000 <br /> Mobilization 10 Is $ 2,500 $ 2,500 <br /> Total Direct Cost $ 2,643,099 <br /> Overhead and Profit Cost(12 60%) $ 333,030 <br /> Contract Cost $ 2,976,129 <br /> Protect Management(9 25%) $ 275,292 <br /> Additional Financial Warranty Required For Phase 5 $ 3,251,421 <br /> Cummulative Financial Warranty Required For Phase 1-5 $15,837,150 <br />