Laserfiche WebLink
As of April 2019 M2013-066 2019 Annual Report <br /> Rev 24JUL19 SOUTH PARCEL <br /> Map Description 0 Status Acres BF Grade Soil Seed Type seed <br /> A Well Pad (Perm/PreEx) Not effected land- maintenance - not part of reclamation <br /> B Roads (Perm/PreEx) Not effected land- maintenance - not part of reclamation <br /> C Industrial Areas Permanently zoned industrial <br /> C1 West Pad (HMA) At final grade 2.4 <br /> C2 East Pad (timber) At final grade 0.9 <br /> C3 North Pad (processing) At final grade (see notes) 1.3 <br /> D Berm/Stockpile on Road At final grade 0.2 0.2 0.2 0.2 dryland <br /> E Southeast Pit Mining completed <br /> Fn Northwest Pond With final configuration (see notes) 1.9 <br /> Fs Southeast Pond With final configuration (see notes) 2.8 <br /> E- Remainder of SE Pit At final grade, soiled, seeded 12.7 12.7 semi-irr <br /> Summary of Areas(in acres) 22.2 0.0 0.2 0.2 12.8 <br /> Highwalls NONE <br /> Note:Tasks listed are based on reclamation to be done immediately with no further mining.As mining <br /> continues (2019-2022),Areas to the West of the Permanent Roads may be mined. <br /> Excavation and shaping of ponds has been done without dewatering. Pond slopes 3:1 for at least 15 feet <br /> below normal water level. Water level in ponds rises and falls with river. <br /> Areas measured from 2018 and June 2019 arial photos (courtesy FEMA and County) <br /> Grading includes Grading, contouring,final contouring and scarification. <br /> Placement of soil to include ripping of compacted surface. <br /> Seeding includes reseeding of entire 14.0 acres of Area E except for industrial pads. <br /> Seeding: Grazing mix Upper areas 0.2 acres min 18 inches soil <br /> Seeding: Semi-irrigated mix Vicinity of ponds 12.7 acres min 24 inches soil <br />