My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-12_REVISION - M2013066
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2013066
>
2019-08-12_REVISION - M2013066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:34:37 AM
Creation date
8/12/2019 3:24:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013066
IBM Index Class Name
Revision
Doc Date
8/12/2019
Doc Name
Adequacy Review Response
From
Arboles Sand & Stone, LLC/Wasteline Inc.
To
DRMS
Type & Sequence
TR1
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
As of April 2019 M2013-066 2019 Annual Report <br /> Rev 24JUL19 SOUTH PARCEL <br /> Map Description 0 Status Acres BF Grade Soil Seed Type seed <br /> A Well Pad (Perm/PreEx) Not effected land- maintenance - not part of reclamation <br /> B Roads (Perm/PreEx) Not effected land- maintenance - not part of reclamation <br /> C Industrial Areas Permanently zoned industrial <br /> C1 West Pad (HMA) At final grade 2.4 <br /> C2 East Pad (timber) At final grade 0.9 <br /> C3 North Pad (processing) At final grade (see notes) 1.3 <br /> D Berm/Stockpile on Road At final grade 0.2 0.2 0.2 0.2 dryland <br /> E Southeast Pit Mining completed <br /> Fn Northwest Pond With final configuration (see notes) 1.9 <br /> Fs Southeast Pond With final configuration (see notes) 2.8 <br /> E- Remainder of SE Pit At final grade, soiled, seeded 12.7 12.7 semi-irr <br /> Summary of Areas(in acres) 22.2 0.0 0.2 0.2 12.8 <br /> Highwalls NONE <br /> Note:Tasks listed are based on reclamation to be done immediately with no further mining.As mining <br /> continues (2019-2022),Areas to the West of the Permanent Roads may be mined. <br /> Excavation and shaping of ponds has been done without dewatering. Pond slopes 3:1 for at least 15 feet <br /> below normal water level. Water level in ponds rises and falls with river. <br /> Areas measured from 2018 and June 2019 arial photos (courtesy FEMA and County) <br /> Grading includes Grading, contouring,final contouring and scarification. <br /> Placement of soil to include ripping of compacted surface. <br /> Seeding includes reseeding of entire 14.0 acres of Area E except for industrial pads. <br /> Seeding: Grazing mix Upper areas 0.2 acres min 18 inches soil <br /> Seeding: Semi-irrigated mix Vicinity of ponds 12.7 acres min 24 inches soil <br />
The URL can be used to link to this page
Your browser does not support the video tag.