Laserfiche WebLink
Reclamation Estimate M2013-066 Loblolly Pit a/o July 2019 N Barton <br /> Activity Area ac Cost ac Total cost Notes/description <br /> Backfill 5.4 $ 2,916 $ 15,603 Including fill of slopes of ponds <br /> Grading and contouring 12.9 $ 900 $ 11,573 Including erosion repair <br /> Scarification/final contouring 12.9 $ 400 $ 5,144 Disturbed and compacted areas (plants, stockpiles) <br /> Place soil/prepare seedbed 9.9 $ 400 $ 3,973 Placing and blending soil and any amendments <br /> Revegetation (seeding etc.) 25.5 $ 1,000 $ 25,521 Including seed, sowing, and mulching+33% redo <br /> Removal of structures 0 $ - <br /> Removal of highwalls 715 LCY $.85/Icy $ 608 For ponds F2 & F3 into ponds <br /> Pond surveying $ 3,500 By boat to determine 3:1 slope is met <br /> Total work $ 61,814 <br /> Estimated overhead 25% $ 15,454 <br /> Total estimated warranty. $ 77,268 <br /> Notes: <br /> This is based on conditions as of May 2019, before work on South Parcel was performed. <br /> This is assuming that industrial sites in South Parcel will be soiled and seeded. <br /> Anticipate requesting total reclamation release of approximately 15 acres of South Parcel Spring 2020. <br />