Laserfiche WebLink
As of April 2019 M2013-066 2019 Annual Report <br /> Revised 24JUL19 NORTH PARCEL <br /> Map Description Status Acres BF Grade Soil Seed Type Seed <br /> A Well Pad (Perm/PreEx) Not effected land - maintenance - not part of reclamation <br /> B West Road (Perm/PreEx) Not effected land- maintenance - not part of reclamation <br /> C East Road (Perm/PreEx) Not effected land -maintenance - not part of reclamation <br /> D Soil stockpiles At final grade 2.0 2.0 2.0 2.0 Grazing <br /> E Work and traffic areas No change in grade to date 3.4 1.0 3.4 3.4 3.4 Grazing <br /> F Ponds (excavations) Active mining and processing 2.9 2.9 2.9 Semi-irr <br /> F1 North Pond (excavations) Filling(silt from wash plant) 0.6 <br /> F2 South Pond (excavations) Active mining and processing 1.5 <br /> F3 East Pond (excavation) Past mining-clean water supply 0.8 <br /> G Unaffected "islands" Not affected land - protect 0.8 <br /> H Areas to be sloped Not all currently affected 1.6 1.6 1.6 1.6 1.6 Semi-irr <br /> H1 Area to be sloped to pond Already affected 0.4 <br /> H2 Area to be sloped to pond Not yet affected 1.1 <br /> J Future areas (2019-2024) To be mined 2.8 2.8 2.8 2.8 2.8 Grazing <br /> Summary of Areas(in acres) 12.7 5.4 12.7 9.8 12.7 <br /> Highwalls Total 583 ft(F2)+ 335 ft (F3)=918 ft(avg 6 ft high) at 1:1 to be flattened to 3:1 <br /> Note:Tasks listed are based on reclamation to be done immediately with no further mining. As mining <br /> continues(2019-2022), Pond areas will be expanded, and work areas will be reduced by reclamation. <br /> Excavation and shaping of ponds done without dewatering. Pond slopes 3:1 for at least 15 feet <br /> below normal water level. <br /> Areas measured from 2018 and June 2019 arial photos (courtesy FEMA and County) <br /> Grading includes Grading, contouring,final contouring and scarification. <br /> Seeding: Grazing mix Upper areas 8.2 acres min 18 inches soil <br /> Seeding: Semi-irrigated mix Vicinity of ponds 4.5 acres min 24 inches soil <br /> Surveying in water of 4.0 acres estimated at$3,500 (survey crew 4 hrs@$220/hr+ boat 4 hrs@50/hr, 25-ft grid <br />