Laserfiche WebLink
Table C-1 Mining Area Material Table <br /> Mining Time Table <br /> Year Phase Activity Tons <br /> 2019 Phase 1 Stripping, Mining and Stockpiling 45,000 <br /> 2020 Phase 1 Stripping, Mining and Stockpiling 45,000 <br /> 2021 Phase 1 Stripping, Mining and Stockpiling 45,000 <br /> 2022 Phase 1 Reclamation <br /> Total Phase 1 135,000 <br /> The material volumes described in Table C-1 are approximate and are based on existing Farm <br /> Road Improvement projections.Note that the areas above are in the mining area. <br />