2. Minim Timetable <br /> The following table (Table C-1)is a best estimate of the sequence of operations for the life of <br /> the mine and is based on producing 45,000 raw tons per year. <br /> 3. Mine Facilities and Operation <br /> The raw gravel will be mined with a loader or excavator and processed through a gravel crusher. <br /> A SPCC Plan will be placed in the site office and the employees will be trained to take the <br /> appropriate steps for inspections and spill response in case of a spill. All portable plants will <br /> have their own tanks built into the plant that have built-in secondary containment and are <br /> covered under their own portable plant SPCC Plans. If any fuel spill is encountered,the material <br /> will be removed from the site. The Division will be notified in the case of any spill. Upon final <br /> reclamation, all equipment will be removed from the site. <br /> No permanent structures will be built within the mining area. <br /> Maintenance vehicles will visit the site regularly to provide oil, grease, and perform other minor <br /> maintenance on vehicles and equipment. <br /> The following list is the best estimate of the required equipment to be used onsite throughout the <br /> mine life: <br /> Gravel Crushing Equipment <br /> • Portable crushing plant <br /> • Water Truck for dust suppression <br /> • Wheel Loader Cat 988, Cat 980 <br /> • Cat D-9 size dozer or equivalent <br /> • Caterpillar Excavator with Thumb <br /> Support equipment will to come to the site on an as-needed basis. <br /> It is anticipated that blasting will not be required. <br />