Laserfiche WebLink
Homestake Mining Company May 10,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> 5.7.1. Previous Reclamation <br /> Per the Minerals Program Inspection Report performed on July 25, 2018 (CDRMS, 2018b), the <br /> Limestone Quarry slopes appear stable, but reclamation of the entire quarry area has not <br /> occurred yet. <br /> 5.7.2. Proposed Reclamation <br /> The reclamation activities proposed within the Limestone Quarry include regrading to approximate <br /> the slopes of surrounding areas, which currently support revegetation, and reseeding. <br /> The reclamation areas will be regraded to the final topography shown on Exhibit F Map F-07B. <br /> 5.8. Operable Unit 8: Shop Building, Fuel Storage and Equipment <br /> The various components comprising the Shop Building, Fuel Storage and Equipment are shown <br /> on Exhibit F Map F-08A. <br /> 5.8.1. Previous Reclamation <br /> The fuel storage area has been removed and reclaimed, and various equipment removed from <br /> site. <br /> 5.8.2. Proposed Reclamation <br /> The following reclamation activities are proposed within the Shop Building, Fuel Storage and <br /> Equipment: <br /> • Materials and supplies that are contained in the Shop Building will be removed and <br /> disposed of off-site if not needed for future use. As far as is known there are no <br /> contaminants and no hydrocarbons to dispose of. <br /> The Shop Building and adjacent areas will be left as a permanent feature. Existing roads and <br /> drainage features within this operable unit are located on private property and will remain open to <br /> accommodate general site access and routine maintenance or access necessities. <br /> 5.9. Operable Unit 9: Mill Site and Stormwater Pond <br /> The current topography for the Mill Site and Stormwater Pond is shown on Exhibit F Map F-09A. <br /> 5.9.1. Previous Reclamation <br /> Per the Minerals Program Inspection Report performed on July 25, 2018 (CDRMS, 2018b), final <br /> reclamation grading has been completed in the Mill Site area, as shown on Exhibit F Map F-09A. <br /> It is also stated that the area has been seeded and vegetation is well established. <br /> 5.9.2. Proposed Reclamation <br /> No additional reclamation activities are proposed. <br /> EXHIBIT E-RULE 6.4.5(AMENDED RECLAMATION PLAN) Page 73 <br /> HOMESTAKE MINING COMPANY <br />