My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-06-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:52:38 AM
Creation date
7/1/2019 1:16:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
6/28/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR115
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br /> Misc. Unit Costs <br /> Project Name: BP2020 Version 1 -Reclamation Plan <br /> Date of Submittal: June 2019 <br /> File Name: SRCE_NMC_CCV_2020BP_V1_LOM_SERV5.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRC E_Cost_data_NMC_20209BP_6JuneV4.xIsm <br /> Cost Estimate Type:LOM Cost Basis:Newmont CC&V LOM <br /> Concrete Structure Installation <br /> Weekly dumpster rental rates from Means Heavy Construction 2005 Edition with permission by R.S.Means/Reed Construction Data. <br /> Weekly dum ster rental rates include haul to off-site disposal site and disposal fees <br /> Daily <br /> Means Number Unit Crew Output Materials Labor Equipment Premium Total Notes <br /> Reinforced Concrete Bulkheads and Shaft Covers <br /> Grade walls-15 in 400mm thick,8 ft 2.5m high 03310-240-4300 C.Y. I C-14D 1 80.02 1 $167.001 $141.821 $13.81 $32Z631 includes reinforcing <br /> Grade walls-15 in 400mm thick,12 ft 3.7m hi h 03310-240-4350 C.Y. C-14D 26.2 1 $167.001 $433.131 $42.191 1 $642.321 includes reinforcing <br /> Elevated conc,1-way beam&slab-15ft 4.6m span 03310-240-2700 C.Y. C-14B 1 20.59 1 $290.001 $572.881 $53.681 1 $916.561 includes reinforcing <br /> Elevated conc,1-way beam&slab-25ft(7.5m)spar 03310-240-2750 C.Y. C-14B 1 28.36 1 $276.001 $415.931 $38.981 1 $730.911 includes reinforcing <br /> Bat Gate/Foam Plug Installation <br /> Bat Gate 5 ea 1 $3,039.441 1 1 1 Imaterials$/ea.Installed <br /> Culvert Gate 5 ea. $6,078.87 1 materials$/ea.Installed <br /> Adit Foam Plug 6 ea./C.Y. 1 $303.94 materials$/cy placed <br /> Production Opening Foam Plug 6 ea./C.Y. 1 $303.941 1 1 1 Imatenals$/cy placed <br /> NOTES: <br /> 5 Bat Gate Source:INV BLM,2/2006:8 hr+1 hr mob/demob+1 hr setup per gate(adjusted to 2018 <br /> 6 Foam Plug Source:INV BLM,2/2006:8 hr+1 hr mob/demob+1 hr setup per adit:16 hrs per production opening(adjusted to 2018 <br /> 611812019 <br /> try ng t G 8 4-2009 <br /> sx<�F.s�e.. All F,gh�,Rese,.el. 3 of 6 Misc.Unit Costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.