Laserfiche WebLink
Closure Cost Estimate <br /> Misc. Unit Costs - <br /> Project Name: BP2020 Version 1 -Reclamation Plan <br /> Date of Submittal: June 2019 <br /> File Name: SRCE_NMC_CCV_2020BP_V1_LOM_SERV5.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data_NMC_20209BP_6JuneV4.xlsm <br /> Cost Estimate Type:LOM Cost Basis:Newmont CCBV LOM <br /> Waste Disposal <br /> Unit rates from Means Heavy Construction 2006 Edition by permission of R.S.Means/Reed Construction Data. <br /> Daily <br /> Means Number Unit Crew Output Materials Labor Equipment Total Notes <br /> Rubbish Handling <br /> Dum ster delivery(average for all sizes 02220-350-0910 ea. 1 $56.001 1 1 1 $56.00 <br /> Haul(average for all sizes 02220-350-0920 ea. $175.001 1 1 1 $175.00 <br /> Rent per month(average for all sizes 02220-350-0940 ea 1 1 $59.501 1 1 1 $59.50 <br /> Disposal fee per ton tonne (average for all sizes 02220-350-0950 ton1 1 $65.501 1 1 1 $65.50 <br /> NOTES: <br /> Dum ster Cost Sourcel Means Heavy Construction 2018 <br /> Dumpster Disposal Fee Source:Means Heavy Construction 2018 <br /> Hazardous Material Handling-Solids(+Liquids in drums) <br /> Pickup fees 55 gal 200 L.drums 02110-300-1100 ea. 1 $259.00 1 1 1 $259.00 <br /> Bulk material(average 02110-300-1220/1230 ton 1 $423.00 1 1 $423.00 <br /> Transport-truck load 80 drums,25 c m3,18 tons 02110-300-1260/1270 mile 1 $5.78 1 1 $5.78 <br /> Dump site solid disposal fee 02110-300-6000/6020 ton 1 $298.50 1 1 $298.50 <br /> NOTES: <br /> Solid Handling Cost Source Means Hea Construction 2018 <br /> Solid Disposal Fee Source:Means Heavy Construction(2018) <br /> Hazardous Material Handling-Liquids <br /> Vacuum Truck Pickup 2200 al/8300 L 02110-300-3110 1 hr I 1 1 $152.001 1 1 1 $152.00 <br /> Vacuum Truck Pickup 5000 al/19000 Q1 02110-300-3120 1 hr. I 1 1 $220.001 1 1 1 $220.00 <br /> Dump site liquid disposal feel 02110-300-6000/6020 1 ton I 1 1 $298.501 1 1 1 $298.50 <br /> NOTES: <br /> Liquid Handling Cost Source Means Hea Construction 2018 <br /> Liquid Disposal Fee Source:2018 Means Hea Construction,ave.02 81 <br /> Hydrocarbon Contaminated Soils(HCS) <br /> Insitu Biotreatment o2115-200-2020/2021 C.Y. $18.721 1 $18.72 <br /> HCS disposal feel 02115-200-2050/2055 1 C.Y. I 1 1 $288.501 1 1 1 $288.50 <br /> NOTES: <br /> Insitu Treatement Cost Source 2018 Means Heav Construction,ave.02 65 <br /> HCS Disposal Fee Source:2018 Means Heav Construction,ave.02 65 <br /> 611812019 <br /> ('R nght®21104.M119 <br /> sxc�aon..re_nu a�gm,a��a. 2of6 Misc.Unit Costs <br />