My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-06-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:52:38 AM
Creation date
7/1/2019 1:16:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
6/28/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR115
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Closure Cost Estimate <br /> Misc. Unit Costs . <br /> Project Name: BP2020 Version 1 -Reclamation Plan <br /> Date of Submittal: June 2019 <br /> File Name: SRCE_NMC_CCV_2020BP_V1_LOM_SERV5.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data_NMC_20209BP_6JuneV4.xlsm <br /> Cost Estimate Type:LOM Cost Basis:Newmont CCBV LOM <br /> Revegetation <br /> Daily Daily Output <br /> Means Number Unit Crew Output User Materials Labor Equipment Total Notes <br /> Seeding-Broadcast Hand 1 acres $140.00 $50.00 $190.00 <br /> Seeding-Broadcast Mechanical 1 acres $150.00 $150.90 $300.90 <br /> Seeding-Drill 1 acres 365 $0.00 <br /> Seeding-Hy droseedin 1 365 $260.00 $275.60 $535.60 <br /> Shrub Planting-bare root 6-10 in 150-250mm 2 02910-400-0561 1 ea. 1 Clab 1 365 1 1 1 $1.231 $0.001 $1.23 <br /> Tree Planting-bare root 11-16 in 270-400mm 3 02910-400-0562 1 ea. 1 Clab 1 60 $6.40 $1.721 $0.001 $1.72 <br /> Cactus Planting 4 ea. 1 Clab $0.00 <br /> NOTES: <br /> 1 Seedinq Source: mechanical=2018 Carlin rate+2%,manual=bond <br /> 2 Shrub Source: <br /> 3 Tree Source: <br /> 4 Cactus Source: <br /> Building and Wall Demolition <br /> Hourly productivity rates and crew composition from Means Heavy Construction 2005 Edition by permission of R.S.MeanslReed Construction Data. <br /> All equipment,labor and material unit costs are from Labor Costs,Equipment Costs and Material Costs spreadsheets <br /> Daily Daily Output <br /> Means Number Unit Crew Output User Labor Equipment Premium Total Notes <br /> Building Demolition <br /> L .steel 02220-110-0012 C.F. B-8 21500 $0.15 $0.11 $0.26 <br /> Lg.concrete 02220-110-0050 C.F. B-8 15300 $0.22 $0.15 $0.37 <br /> L .masonry02220-110-0080 C.F. B-8 20100 $0.16 $0.11 $0.27 <br /> Lg.mixed 02220-110-0100 C.F. B-8 20100 $0.16 $0.11 $0.27 <br /> Sm.steel 02220-110-0500 C.F. B-3 14800 $0.19 $0.11 $0.30 <br /> Sm.concrete 02220-110-0600 C.F. B-3 11300 $0.25 $0.15 $0.40 <br /> Sm.masonr 02220-110-0650 C.F. B-3 14800 $0.19 $0.11 $0.30 <br /> Sm.wood 02220-110-0700 C.F. B-3 1 14800 1 1 $0.191 $0.111 1 $0.30 <br /> Wall Demolition <br /> Block 4 in 100 mm thick 02220-130-2000 S.F. 1 Clab 180 $2.49 $0.00 20% $2.99 <br /> Block 6 in 150 mm thick 02220-130-2040 S.F. 1 Clab 170 $2.63 $0.00 20% $3.16 <br /> Block 8 in 200 mm thick 02220-130-2080 S.F. 1 Clab 150 $2.98 $0.00 20% $3.58 <br /> Block 12 in 300 mm thick 02220-130-2100 S.F. 1 Clab 150 $2.98 $0.00 20% $3.58 <br /> Conc 6 in 150 mm thick 02220-130-2400 S.F. B-9 160 $17.77 $1.35 10% $21.03 <br /> Conc 8 in 200 mm thick 02220-130-2420 S.F. B-9 140 $20.31 $1.54 10% $24.04 <br /> Conc 10 in 250 mm thick 02220-130-2440 S.F. B-9 120 $23.70 $1.80 10% $28.05 <br /> Conc 12 in 300 mm thick 02220-130-2500 S.F. B-9 100 1 1 $28.441 $2.15 10% $33.65 <br /> 6/18/2019 <br /> k, s."n krm 1 of 6 Misc.Unit Costs <br />
The URL can be used to link to this page
Your browser does not support the video tag.