Laserfiche WebLink
The following timetable indicates the schedule of reclamation. <br /> Table E-2 Reclamation Timetable <br /> Years Activity <br /> 1 mess and set up processing area. <br /> 2-3 Pit 1 mining <br /> 3-9 Pit 2 mining;Pit 1 reclamation completed. <br /> 9-20 Pit 3 mining; Pit 2 reclamation completed. <br /> 20-25 Pit 4 mining;Pit 3 reclamation completed. <br /> 25-27 Pit 4 reclamation completed;Truck scales and office removal; <br /> Final topsoiling and revegetation <br /> 6. Post-Reclamation Site Drainage <br /> Map F-1 shows arrows indicating the approximate direction of drainage throughout the pit. <br /> 7. Weed Control <br /> Prior to the initiation of any activities at the site, an assessment and inventory of all noxious <br /> weeds and plants will be conducted. Schofield Excavation will take extreme care in preventing <br /> weeds from establishing infestations in the permit area by, dependent upon snow melt and the <br /> onset of the growing season, conducting a noxious weed survey of the permit area. If any patches <br /> or plants are identified,they will be sprayed by backpack sprayer or 4-wheeler using chemicals <br /> approved for use by the weed control staff of Lake County. This will be done within 2 weeks <br /> after the inspection when the weeds are most vulnerable. Care will be taken to spot spray, where <br /> possible, to avoid killing desirable broadleaf plants. After reclamation of portions of the site and <br /> after final reclamation, weed surveys and spraying will continue until the perennial cover and <br /> production of the site meet DRMS requirements and bond release is obtained. The Division and <br /> Lake County weed control staff will be consulted regarding a weed infestation area and any <br /> control measures prior to their initiation. <br /> 8. Revegetation Success Criteria <br /> Revegetation will be deemed adequate when erosion is controlled and the vegetation is <br /> considered satisfactory according to Division standards. <br /> 9. Monitoring Reclamation Success <br /> Birdseye Pit (.rq,1 cw icli and%ss"iatc.,PI 1 A <br /> June 2019 E-4 <br />