Laserfiche WebLink
Modifications to the reclamation plan are not anticipated; however, any modifications to the <br /> reclamation plan will be submitted in writing to DRMS prior to their implementation. <br /> Monitoring reclamation on an ongoing basis will ensure its success. The Operator plans to use <br /> the local NRCS office to determine the capacity of the reclaimed land to control erosion. If <br /> minor changes or modifications are needed to the seeding and reclamation plan, revision plans <br /> will be submitted to the Division. It is hoped that the Division will provide assistance in <br /> evaluating the success of the ongoing reclamation process. Information on all areas disturbed and <br /> reclaimed as well as any other important items regarding the reclamation will be submitted in <br /> annual reports to the Division. <br /> Birdseye Pit (.m t mirki and As. dale-,14AA <br /> June 2019 E-5 <br />