Laserfiche WebLink
batch plants may operate year-round utilizing stockpiles generated during mining and processing <br /> operations. All plants will be portable. <br /> 6. Lake County Impacts and Environmental Impacts <br /> The impacts to Lake County are expected to be limited. No dust is expected from the operation <br /> due to the pit and roads being watered as needed. In the event that airborne dust is observable, <br /> immediate action to mitigate dust via roadway wetting and a slowdown of production will be <br /> initiated and sustained until airborne dust is mitigated. Magnesium chloride and gravelling of <br /> haul roads may also occur, if necessary, to control dust. <br /> BZYdseye pit lacy I chic►i and lsuwvilcs•N I.( <br /> June 2019 D-9 <br />