MR215 Liability
<br />(Mid-Term
<br />Review Response)
<br />(Revised Prop
<br />Dec Form;
<br />Signed 12/1/10)
<br />(2nd Revised Prop
<br />Dec Form;
<br />Signed 2/23/11)
<br />$30,173,724.00
<br />$30,173,724.00
<br />(the value of
<br />$30,173,724.00
<br />inadvertently
<br />included the
<br />$898,333.00
<br />released by SL9)
<br />$0.00
<br />-$896,768.00
<br />(this number was
<br />not an attempt to
<br />subtract the
<br />$898,333.00
<br />released by SL9
<br />that was
<br />inadvertently
<br />added back by the
<br />2nd Revised
<br />Proposed Decision
<br />Form for PR6; the
<br />$896,768 value was
<br />just the difference
<br />between the
<br />$30,173,724.00 in
<br />the Permit System
<br />and the revised
<br />Mid-Term Review
<br />site-wide cost
<br />estimate amount of
<br />$29,276,956.00)
<br />(a new amount of
<br />$1,376,027.00 was
<br />subtracted from
<br />the $30,173,724.00
<br />value, due to DRMS
<br />revising for a 2nd
<br />time its Mid-Term
<br />Review site-wide
<br />cost estimate, to
<br />$28,797,697.00)
<br />$30,173,724.00
<br />$29,276,956.00
<br />(In a memo dated
<br />10/22/10, DRMS
<br />revised its Mid-
<br />Term Review site-
<br />wide cost estimate
<br />of $31,127,989.00
<br />down to
<br />$29,276,956.00;
<br />this number of
<br />$29,276,956.00 did
<br />not include the
<br />$898,883 that was
<br />included in the
<br />$30,173,724.00
<br />number).
<br />$28,797,697.00
<br />(In a memo dated
<br />2/17/11, DRMS
<br />revised for a 2nd
<br />time, its Mid-Term
<br />Review site-wide
<br />cost estimate, from
<br />$29,276,956.00 to
<br />$28,797,697.00;
<br />this number of
<br />$28,797,697.00 did
<br />not include the
<br />$898,883 that was
<br />included in the
<br />$30,173,724.00
<br />number).
<br />SL11 Dist Acres
<br />(Phase I)
<br />(Revised Prop
<br />Dec Form;
<br />Signed 2/23/11)
<br />1/7/2011
<br />(2/23/2011)
<br />3670.01
<br />3670.01
<br />0.00
<br />0.00
<br />3670.01
<br />3670.01
|