Laserfiche WebLink
TR106 Dist Acres <br />(Change to Mine <br />Plan Sequence) <br />(Revised Prop <br />Dec Form; <br />Signed 5/21/10) <br />5/12/10 <br />5/21/10 <br />3670.01 <br />3670.01 <br />0.00 <br />0.00 <br />3670.01 <br />3670.01 <br />TR106 Liability <br />(Change to Mine <br />Plan Sequence) <br />(Revised Prop <br />Dec Form; <br />Signed 5/21/10) <br />$29,201,224.00 <br />$30,099,557.00 <br />(the value of <br />$30,099,557.00 <br />inadvertently <br />included the <br />$898,333.00 <br />released by SL9) <br />+$74,167.00 <br />$74,167.00 <br />$29,275,391.00 <br />$30,173,724.00 <br />(the value of <br />$30,173,724.00 <br />inadvertently <br />included the <br />$898,333.00 <br />released by SL9) <br />Mid-Term Review MT6, dated 6/4/2010, determined that the site-wide reclamation cost estimate at <br />that time was $31,127,989.00. This $31,127,989.00 value did not include the $898,333 that was <br />inadvertently added back into the site’s reclamation liability amount in the Permit System. Therefore, <br />when MR215 (Mid-Term Review Responses) was approved, the $898,333 was appropriately no longer <br />in the System. MR215 had 3 Final Liability numbers, the original amount of $30,173,724.00 <br />(11/12/10), the 1st revised amount of $29,276,956.00 (12/1/2010), and the 2nd revised amount of <br />$28,797,697.00 (2/23/2011): <br />MR215 Dist Acres <br />(Mid-Term <br />Review Response) <br />(Revised Prop <br />Dec Form; <br />Signed 12/1/10) <br />(2nd Revised Prop <br />Dec Form; <br />Signed 2/23/11) <br />11/12/2010 <br />(12/1/2010) <br />(2/23/2011) <br />3670.01 <br />3670.01 <br />3670.01 <br />0.00 <br />0.00 <br />0.00 <br />3670.01 <br />3670.01 <br />3670.01