SL11 Liability
<br />(Phase I)
<br />(Revised Prop
<br />Dec Form;
<br />Signed 2/23/11)
<br />$29,276,956.00
<br />(this number was
<br />the Division’s first
<br />revised Mid-Term
<br />Review cost
<br />estimate number; it
<br />did not include the
<br />$898,333 released
<br />by SL9)
<br />$28,797,697.00
<br />(this number was
<br />the Division’s
<br />second revised Mid-
<br />Term Review cost
<br />estimate number; it
<br />did not include the
<br />$898,333 released
<br />by SL9)
<br />$0.00
<br />$29,276,956.00
<br />(this number was
<br />the Division’s first
<br />revised Mid-Term
<br />Review cost
<br />estimate number; it
<br />did not include the
<br />$898,333 released
<br />by SL9)
<br />$28,797,697.00
<br />(this number was
<br />the Division’s
<br />second revised Mid-
<br />Term Review cost
<br />estimate number; it
<br />did not include the
<br />$898,333 released
<br />by SL9)
<br />MR216 Dist Acres 4/4/2011 3670.01 0.00 3670.01
<br />MR216 Liability $28,797,697.00 $0.00 $28,797,697.00
<br />TR108 Dist Acres
<br />(2010 Ann Rept) 7/28/2011
<br />3670.01 0.00 3670.01
<br />TR108 Liability
<br />(2010 Ann Rept) $28,797,697.00 $0.00 $28,797,697.00
<br />MR217 Dist Acres
<br />(4 Expl Holes) 9/2/2011
<br />3670.01 0.00 3670.01
<br />TR217 Liability
<br />(4 Expl Holes) $28,797,697.00 $16,457.45 $28,814,154.45
<br />MR218 Dist Acres 10/26/2011 3670.01 0.00 3670.01
<br />MR218 Liability $28,814,154.45 $0.00 $28,814,154.45
<br />MR219 Dist Acres 1/27/2012 3670.01 0.00 3670.01
<br />MR219 Liability $28,814,154.45 $0.00 $28,814,154.45
<br />During the Division’s review of SL12, the Division mistakenly increased the pre-SL12 liability amount in
<br />the Permit System from $28,814,154.45 to $29,276,956.00, rather than leave the pre-SL12 liability
<br />amount at $28,814,154.45. The $29,276,956.00 amount was the post-MR215 liability amount shown
<br />on the 1st revised MR215 Decision Form dated 12/1/10 (MR215 was submitted in response to Mid-
<br />Term Review MT6, conducted on 6/4/2010); however, the Division had actually revised the
<br />$29,276,956.00 amount down to $28,797,697.00, as documented on the 2nd revised MR215 Decision
<br />form dated 2/23/11. Nevertheless, the Division should not have increased the pre-SL12 liability
<br />amount; it should have been left at $28,814,154.45.
<br />Adjustment to
<br />Liability Amount
<br />in Permit System
<br />- Dist Acres
<br />Unknown
<br />Date 3670.01 0.00 3670.01
|