My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-07_PERMIT FILE - M2019025
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019025
>
2019-06-07_PERMIT FILE - M2019025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:36:23 AM
Creation date
6/10/2019 3:30:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019025
IBM Index Class Name
PERMIT FILE
Doc Date
6/7/2019
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Weiland, Inc.
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weiland Inc. <br /> .Tune 7, 2019 <br /> Page 3 of 7 <br /> structures be installed immediately following excavation of a cell. How does the permittee intend to minimize the <br /> impacts to the hydrologic balance and prevent stream capture during food events? <br /> EXHIBIT E- Reclamation Plan (Rule 6.4.5): <br /> (1) In preparing the Reclamation Plan, you should be specific in terms of addressing such items as final grading <br /> (including drainage), seeding, fertilizing,revegetation(trees, shrubs, etc.), and topsoiling. You are encouraged to <br /> allow flexibility in your plans by committing to ranges of numbers (e.g., 6"-12" of topsoil)rather than specific <br /> figures. <br /> (2)The Reclamation Plan shall include provisions for, or satisfactory explanation of, all general requirements for <br /> the type of reclamation proposed to be implemented by you. Reclamation shall be required on all the affected <br /> land. The Reclamation Plans shall include: <br /> (a)A description of the type(s) of reclamation you propose to achieve in the reclamation of the affected <br /> land, why each was chosen,the amount of acreage accorded to each, and a general discussion of methods <br /> of reclamation as related to the mechanics of earthmoving; <br /> (b) A comparison of the proposed post-mining land use to other land uses in the vicinity and to adopted <br /> state and local land use plans and programs. In those instances where the post-mining land use is for <br /> industrial,residential, or commercial purposes and such use is not reasonably assured, a plan for <br /> revegetation shall be submitted. Appropriate evidence supporting such reasonable assurance shall be <br /> submitted; <br /> (c)A description of how the Reclamation Plan will be implemented to meet each applicable requirement <br /> of Section 3.1; <br /> (d) Where applicable,plans for topsoil segregation,preservation, and replacement; for stabilization, <br /> compaction, and grading of spoil; and for revegetation. The revegetation plan shall contain a list of the <br /> preferred species of grass, legumes, forbs, shrubs or trees to be planted,the method and rates of seeding <br /> and planting, the estimated availability of viable seeds in sufficient quantities of the species proposed to <br /> be used, and the proposed time of seeding and planting; <br /> (e)A plan or schedule indicating how and when reclamation will be implemented. Such plan or schedule <br /> shall not be tied to any specific date but shall be tied to implementation or completion of different stages <br /> of the mining operation as described in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br /> (i)An estimate of the periods of time which will be required for the various stages or phases of <br /> reclamation; <br /> (ii) A description of the size and location of each area to be reclaimed during each phase; and <br /> (iii) An outline of the sequence in which each stage or phase of reclamation will be carried out. <br /> (The schedule need not be separate and distinct from the Reclamation Plan,but may be <br /> incorporated therein.) <br /> (f) A description of each of the following: <br /> (i) Final grading- specify maximum anticipated slope gradient or expected ranges thereof, <br />
The URL can be used to link to this page
Your browser does not support the video tag.