Laserfiche WebLink
Weiland Inc. <br /> ,Tune 7, 2019 <br /> Page 4 of 7 <br /> (ii) Seeding- specify types, mixtures,quantities, and expected time(s)of seeding and planting; <br /> (iii) Fertilization- if applicable, specify types, mixtures, quantities and time of application; <br /> (iv) Revegetation- specify types of trees, shrubs, etc.,quantities, size and location; and <br /> (v) Topsoiling- specify anticipated minimum depth or range of depths for those areas where <br /> topsoil will be replaced. <br /> This site is located almost entirely within the floodway of the Big Thompson River. The permittee will need to <br /> provide flood protection for the water storage cells and clay liners to ensure long-term stability(such as armored <br /> inlet/outlet structures, or other). Design and construction details for flood control structures for each cell will <br /> need to be provided, and the installation costs will need to be included in the reclamation cost estimate. <br /> DRMS will also require additional details for the removal/reclamation of the low water crossing. These costs will <br /> also need to be included in the reclamation cost estimate. <br /> EXHIBIT F-Reclamation Plan Map (Rule 6.4.6): The map(s) of the proposed affected land,by all phases of <br /> the total scope of the mining operation, shall indicate the following: <br /> (a) The expected physical appearance of the area of the affected land, correlated to the proposed mining and <br /> reclamation timetables. The map must show proposed topography of the area with contour lines of sufficient <br /> detail to portray the direction and rate of slope of all reclaimed lands; and <br /> (b) Portrayal of the proposed final land use for each portion of the affected lands. <br /> Please include the previously mentioned flood control structures on the reclamation map as appropriate. <br /> EXHIBIT G- Water Information(Rule 6.4.7): <br /> (1) If the operation is not expected to directly affect surface or groundwater systems, a statement of that <br /> expectation shall be submitted. <br /> (2) If the operation is expected to directly affect surface or groundwater systems,you shall: <br /> (a) Locate on the map(in Exhibit Q tributary water courses,wells, springs, stock water ponds, reservoirs, <br /> and ditches on the affected land and on adjacent lands where such structures may be affected by the <br /> proposed mining operations; <br /> (b) Identify all known aquifers; and <br /> (c) Submit a brief statement or plan showing how water from dewatering operations or from runoff from <br /> disturbed areas, piled material and operating surfaces will be managed to protect against pollution of <br /> either surface or groundwater(and, where applicable, control pollution in a manner that is consistent with <br /> water quality discharge permits),both during and after the operation. <br /> (3) You must provide an estimate of the project water requirements including flow rates and annual volumes for <br /> the development, mining and reclamation phases of the project. <br />