May 23, 2019 C-1996-083/Bowie No. 2 Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br /> Basil reported that they have not been able to continue to work on Gob Pile No. 3 due to the wet <br />conditions. BRL will let this pile dry before resuming work on it. <br /> <br />No activity was occurring on Gob pile No. 2. BRL is cleaning sediment from the sediment collection ditches at <br />Gob pile No. 2. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3), Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br />(6)/4.03.2(5) and (6), Reclamation 4.03.1(7)/4.03.2(7): <br /> The roads around the facilities area were wet but drivable. BRL has kept up on road and ditch <br />maintenance in these areas. Due to the weather conditions, wet and rainy, no attempt was made to drive the more <br />remote access roads, to the Terror creek vent shaft, vent pads, or Hubbard Creek vent pad. <br /> <br />BRL continues to clean sediment out of roadside ditches as conditions allow. Ditch D-B15 just west of Curve #3 <br />is down cutting to approximately 4 feet deep in places. Installation of check dams, or anchoring brush or wattl es <br />in the bottom of the ditch may be methods to impede the down cutting. BRL needs to minimize and retard further <br />down cutting in this ditch. <br /> <br />Ditch D-C21 near culvert C-C15 is down cutting. Methods need to be implemented to keep this ditch from down <br />cutting further. <br /> <br />REVEGETATION – Rule 4.15 <br />Vegetative Cover; Timing: <br /> Due to the wet spring, noxious weeds are growing well. BRL continues to implement its weed control <br />plan. However, they stated that they would spray, only for the rain to roll in later that day or the next day. Musk <br />thistle at the D portal had been effectively killed. Jointed goatgrass at the pump house area was treated last fall <br />and the treatment appeared effective. The Division recommends broadcast seeding of a temporary stabilization <br />mix to keep the goatgrass from reinvading. <br /> <br />Keep implementing the approved Weed Management plan as the weather allows. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> BRL continues to drain water away from the two slumps on the slope north of the B portals. BRL has <br />directed all runoff and road drainage away from Ditch D-B6. This ditch is damaged from the slide. Once the area <br />dries out enough, Ditch D-B6 will require reconstruction, or BRL may demonstrate and permit that this ditch is no <br />longer needed. BRL currently is successful in directing the water away from the portal, and into the appropriate <br />ponds, either Pond C or Pond B. <br /> <br />While conditions remain so wet, directing water away from the slumps is acceptable. Once the site dries out, a <br />long term solution to keep water off the slump areas will need to be pursued. <br /> <br />SUPPORT FACILITIES - Rule 4.04: