Laserfiche WebLink
EXHIBIT 13C <br />Table 13C-10 Collom Primary Crusher Demolition* <br />Item Task <br />Primary I 417 <br />Crusher <br />*The item contained on this table references the Division's Reclamation Cost Estimate (RCE) <br />and call out specific tasks within the RCE. The RCE can be found in Exhibit 13A. <br />Table 13C-11 Coll_om_Facilities Concrete Demolition* <br />Item Total Quantity <br />(cubic yards) <br />Concrete 1,293 <br />*This volume includes all concrete at the Collom Facilities for all tables in this section. <br />Table 13C-12 Miscellaneous Facilities Demolition <br />Item <br />T <br />Build <br />Size/Material <br />Blaster Building <br />50'x80'x19' <br />Steel Building <br />417 <br />Raw Water "Tank* <br />ANFO Silos* <br />417 <br />Electrical Substation* <br />417 <br />Communications <br />20' x 20' Steel <br />N/A <br />Building <br />Building <br />Power Poles <br />N/A <br />15 Poles <br />*The items contained on this table reference <br />the Division's Reclamation <br />Cost Estimate (RCE) <br />and call out specific task(s) within the RCE. <br />The RCE can be <br />found in Exhibit 13A. <br />Table 13C -12A Revegetation Requirements for Collom Facilities Area <br />Acres Disturbed Acres to be Reseeded <br />302.5 302.5 <br />Volume 20 Page 9 Revision Date: 5/15/18 <br />Revision No.: RN -07 <br />