Laserfiche WebLink
EXHIBIT 13C <br />Collom Facilities Area <br />Tables 13C-7 through 13C-12 present required information to reclaim and/or demolish items <br />associated with the Collom facilities area. Map 22B shows the areas and structures that will be <br />present for the Collom Mine. Table 13C-10 presents the specific facilities that will be <br />constructed under this cumulative bond schedule. <br />From <br />Table 13C-7 Re rade Volumes for the Collom Facilities Area <br />Area Cut (Cubic Fill (Cubic <br />Yards) Yards) <br />Collom Facilities Area i 1,484,400 1,467,700 <br />Table 13C-8 List of Culverts for the Collom Facilities <br />Length (ft) <br />Culvert Size (inches) <br />Number <br />56 36 150 <br />57 36 260 <br />58 36 140 <br />59 36 145 <br />60 36 56 <br />61 36 71 <br />62 36 75 <br />63 36 326 <br />64 36 150 <br />65 36 415 <br />66 36 130 <br />67 36 183 <br />D2 Ditch 36 160 <br />Culvert <br />Table 13C-9 Topsoil Volumes for the Collom Facilities Area <br />Avg. Haul Volume <br />To Avg. Grade (°fo) <br />Distance (ft) (Cubic Yards) <br />Topsoil Collom Facilities <br />Stockpile 25A Area 6,500 5.0 <br />Note: Includes the Section 26 Pond, Sidehill Pond and West Side Access Road. <br />327,278 <br />Volume 20 Page 8 Revision Date: 5/15/18 <br />Revision No.: RN -07 <br />