Laserfiche WebLink
EXHIBIT 13C <br />Table 13C-10 Collom Primary Crusher Demolition* <br />Item Task <br />Primary 417 <br />Crusher <br />*The item contained on this table references the Division's Reclamation Cost Estimate (RCE) <br />and call out specific tasks within the RCE. The RCE can be found in Exhibit 13B. <br />Table 13C-11 Collom Facilities Concrete Demolition* <br />Item Total Quantity <br />(cubic yards) <br />Concrete 1,293 <br />*This volume includes all concrete at the Collom Facilities for all tables in this section. <br />Table 13C-12 Miscellaneous Facilities Demolition <br />Item Task Build <br />Size/Material <br />Blaster Building 50'x80'xl9' <br />Steel Building <br />Raw Water Tank* <br />417 <br />ANFO Silos* <br />417 <br />Electrical Substation* <br />417 <br />Communications Building <br />N/A <br />20' x 20' Steel <br />Building <br />Main Communication Tower <br />N/A <br />100' Tower/25 <br />Pad <br />cubic yard <br />concrete pad <br />Meteorological Station <br />N/A <br />30' Tower/ 4 <br />cubic yards of <br />concrete <br />Communication Building <br />N/A <br />8'x10' Steel <br />(Collom Substation) <br />Building <br />Communication Building <br />N/A <br />8'x10' Steel <br />(Security Area) <br />Building <br />*The items contained on this table reference the Division's Reclamation Cost Estimate (RCE <br />and call out specific task(s) within the RCE. The RCE can be found in Exhibit 13B. <br />Volume 20 Page 10 Revision Date: 6/19/18 <br />Revision No.: TR -121 <br />