Laserfiche WebLink
<br /> <br /> <br /> <br /> 19 <br />to the north to include service from the recently proposed Nitrogen Plant #2 (MR-160). BME <br />proposed to increase the N2 pipelines to 36,000 feet of 3” and 4” lines and 7,000 feet of 2” lines. <br /> <br />Minor Revision 162 was received on September 23, 2014, deemed complete on October 2, 2014 <br />and approved on October 7, 2014. The revision proposed to construct one additional pond and <br />expand the Last Chance Pond for the B-Seam Dewatering and Treatment System to increase <br />additional storage and to improve the Deserado Mine’s ability to react to unanticipated situations <br />as they may arise. <br /> <br />Minor Revision 163 was received on January 21, 2015, deemed complete on January 27, 2015 <br />and approved on February 9, 2015. The revision proposed to add additional exploration <br />boreholes, vent shaft RS-12L and associated roads to the Deserado Permit. <br /> <br />Minor Revision 164 was received on May 28, 2015, deemed complete on June 5, 2015 and <br />approved on June 22, 2015. The revision proposed the addition of one service hole with <br />associated access roads east of the Transfer Station #2. The revision also proposed to add a <br />small section to the permit text addressing salvage and protection of topsoil on SAE’s. <br /> <br />Minor Revision 165 was received on August 4, 2015, deemed complete on August 10, 2015 and <br />approved on August 12, 2015. The revision proposed the addition of four exploration boreholes <br />with associated roads and the relocation of RS-12L. <br /> <br />Minor Revision 166 was received on September 17, 20015, deemed complete on September 28, <br />2015 and approved on October 16, 2015. The revision proposed to expand the SDH-3/5 D-Seam <br />Dewatering System. The revision proposed to increase the disturbed area by 1.37 acres. <br /> <br />Minor Revision 167 was received on October 13, 2015, deemed complete on October 14, 2015 <br />and approved on October14, 2015. The revision proposed the addition of seven exploration <br />boreholes and one additional hole at the SH-4 site. The disturbed acreage was proposed to <br />increase by 4.07 acres. <br /> <br />Minor Revision 168 was received on November 3, 2015, deemed complete on November 4, 2015 <br />and approved on November 10, 2015. The revision proposed to recontour the intersection of the <br />Haul Road and County Road 65. There was no proposed increase in the disturbed area. <br /> <br />Minor Revision 169 was received on September 15, 2016, deemed complete on September 19, <br />2016 and approved on September 26, 2016. The revision proposed to conduct a geotechnical <br />investigation for the future B-Seam Dewatering System #2. <br /> <br />Minor Revision 170 was received on April 4, 2017, deemed complete on April 10, 2017 and <br />approved on April 10, 2017. The revision proposed to add an additional small pond (Pond 5) to <br />the B-Seam Dewatering System #2. Pond was proposed to be used with Pond 3 and Pond 4 of <br />the system. <br /> <br />Minor Revision 171 was received on June 7, 2017, deemed complete on June 19, 2017 and <br />approved on June 28, 2017. The revision proposed the addition of fifteen development drill