Laserfiche WebLink
<br /> <br /> <br /> <br /> 18 <br />(RN-7). Revised pages included the language from Stipulation 50 into the Deserado Permit. <br /> <br />Stipulation No. 51: <br /> <br />IN ORDER TO PROTECT IMPORTANT SEASONAL WILDLIFE HABITAT (BIG GAME, <br />SEVERE WINTER RANGE), EXPLORATION, DRILLING AND OTHER DEVELOPMENT <br />ACTIVITY MAY NOT BE ALLOWED FOR UP TO 60 DAYS DURING THE PERIOD <br />FROM DECEMBER 1 THROUGH MARCH 31. THIS LIMITATION DOES NOT APPLY TO <br />MAINTENANCE AND OPERATION OF EXISTING FACILITIES. EXCEPTIONS TO THIS <br />LIMITATION IN ANY YEAR MAY BE SPECIFICALLY AUTHORIZED IN WRITING BY <br />THE AREA MANAGER, BUREAU OF LAND MANAGEMENT. <br /> <br />Status: This stipulation was satisfied and will be terminated with the approval of this renewal <br />(RN-7). Revised pages included the language from Stipulation 51 into the Deserado Permit. <br /> <br />Stipulation No. 52: <br /> <br />DRILL SITES AND ACCESS ROADS CONSTRUCTED PURSUANT TO TR-44 SHALL BE <br />LOCATED AS AUTHORIZED BY THE BUREAU OF LAND MANAGEMENT TO ENSURE <br />PROTECTION OF ARCHAEOLOGICAL RESOURCES. <br /> <br />Status: This stipulation was satisfied and terminated on August 12, 2014. <br /> <br />Stipulation No. 53 <br /> <br />THE OPERATOR WILL PROVIDE THE DIVISION WITH A FINAL RECLAMATION <br />PLAN FOR REFUSE PILES RP-2/3/4 AND RP-5A NO LATER THAN 31 JANUARY 2004. <br />THE PLAN SHALL INCLUDE TECHNIQUES TO REDUCE THE OVERLAND SHEET AND <br />RILL FLOW, THEREBY REDUCING CONCENTRATED FLOW OVER THE SURFACE OF <br />THE PILES. <br /> <br />Status: This stipulation was satisfied and terminated on September 1, 2004. <br /> <br />Revisions to the Permit <br /> <br />Minor Revisions, Technical Revisions and Surety Reductions which have been made to the <br />Deserado Mine Permit since the last permit renewal (RN-06) are listed below. <br /> <br />Minor Revisions: <br /> <br />Minor Revision 160 was received on September 3, 2014, deemed complete on September 12, <br />2014 and approved on September 15, 2014. The revision proposed the construction of a second <br />nitrogen plant and associated facilities between Transfer Station #2 and the Slot Storage. <br /> <br />Minor Revision 161 was received on September 9, 2014, deemed complete on September 15, <br />2014 and approved on September 24, 2014. The revision proposed to re-route the N2 pipelines