Laserfiche WebLink
<br /> <br /> <br /> <br /> 17 <br /> <br />THE PERMITTEE SHALL SUBMIT TO THE DIVISION NO LATER THAN MAY 11, 1990 <br />THREE COPIES REVISED MAP 90 SHOWING THE NEW DISTURBED AREA AND <br />REVISED PERMIT TEXT PAGES IV-38 AND IV-38A DESCRIBING THE ACTIVITY AND <br />DISTURBANCE ASSOCIATED WITH THE MINOR REVISION (MR57). <br /> <br />Status: This stipulation was satisfied and terminated on May 11, 1991. <br /> <br />Stipulation No. 47: <br /> <br />SUBMIT REVISED MAPS AND PAGES FOR MR NO. 67. REVISION ADDRESSES <br />DRAINAGE CONTROL DITCH/PIPE AT EAST PORTAL AREA. SUBMITTAL SHOULD <br />INCLUDE REVISED MAP 139, ANY NECESSARY REVISED PAGES. <br /> <br />Status: This stipulation was satisfied and terminated on March 18, 1991. <br /> <br />Stipulation No. 48: <br /> <br />REVISED MAP 139, AND ANY PERTINENT REVISED PAGES <br /> <br />Status: This stipulation was satisfied and terminated on March 18, 1991. <br /> <br />Stipulation No. 49: <br /> <br />49. WESTERN FUELS-, INCORPORATED SHALL SUBMIT TO THE DIVISION ALL <br />INFORMATION REGARDING SUBSIDENCE AS REQUIRED IN RULE 2.05.6(6) FOR ALL <br />LANDS TO BE MINED IN FEDERAL COAL LEASE COC-51551. THIS SUBMITTAL <br />SHALL BE MADE WITHIN SIX (6) MONTHS OF THE PERMIT REVISION DECISION, <br />AND PRIOR TO INITIATION OF MINING ACTIVITIES IN LEASE COC-51551. NO <br />MINING SHALL OCCUR IN SAID LEASE UNTIL SUBSIDENCE CONTROL AND <br />MITIGATION PLANS FOR THE AREA HAVE BEEN APPROVED BY THE DIVISION. <br /> <br />Status: This stipulation was satisfied and terminated on July 1, 1992. <br /> <br />Stipulation No. 50: <br /> <br />IF OPERATOR DISCOVERS ANY CULTURAL REMAINS, MONUMENTS OR SITES, OR <br />ANY OBJECT OF ANTIQUITY, OPERATOR SHALL IMMEDIATELY CEASE ACTIVITY <br />AND REPORT DIRECTLY TO BLM AREA MANAGER. THE BLM SHALL TAKE <br />ACTION AS REQUIRED UNDER THE ACTS AND REGULATIONS. OPERATOR SHALL <br />FOLLOW MITIGATION REQUIREMENTS SET FORTH BY BLM CONCERNING <br />PROTECTION, PRESERVATION OR DISPOSITION OF ANY SITES OR MATERIAL <br />DISCOVERED. COST OF SALVAGE EXCAVATION, IF NECESSARY, SHALL BE <br />BORNE BY THE OPERATOR UNLESS OTHERWISE STATED. <br /> <br />Status: This stipulation was satisfied and will be terminated with the approval of this renewal