Laserfiche WebLink
C-5 <br /> TABLE C-1: LIST OF MINING EQUIPMENT <br /> Type Size* Otty Application <br /> Mining <br /> Hydraulic Excavator John Deere 350 (2 Yd3) 1 Mining/Loading <br /> Front-End Loader John Deere 644(4 Yd3) 3 Plant/Loading/Misc. <br /> Dozer John Deere 850 1 Mining/Utility <br /> Articulated Haul Truck John Deere 410 ADT(40 T) 1 Haul Pit to Plant <br /> Water Truck 5,000 gal. Capacity 1 Dust Control/Road Maintenance <br /> Support Equipment <br /> Roller Compactor ----- 1 Site Prep/Road Maintenance <br /> Utility Pickup Ford F250 3 Utility/Supervisory/Crew <br /> *Or equivalent. Unit specified is for size and horsepower representation only;actual unit(s)may vary <br /> Emergency response services are available locally(in Keenesburg)through the Southeast Weld Fire Protection <br /> District (SWFPD). In addition, the District maintains mutual aid agreements with surrounding fire and <br /> ambulance services such as those available in Brighton and/or Greeley. SWFPD is staffed with career and <br /> volunteer/reserve personnel providing fire prevention, suppression,property preservation,emergency medical, <br /> and rescue and related emergency services. In addition,SWFPD operates an Advanced Life Support Paramedic <br /> Transport Ambulance through a partnership with the Platte Valley Medical Center in Brighton. <br /> Site Development Sequence: The first activity associated with site development (refer to Figure C-2: Mine <br /> Development Phases)will encompass the pre-stripping of those portions of the Permit Area that will be subject <br /> to significant disturbance,to include areas overlying: (a)the mine pit footprint(with the exception of the below- <br /> described interim TS-IA "topsoil' stockpile area); (b) the fines recovery cell footprint; and, (c) the perimeter <br /> Keenesburg Project—Limited Impact 110 Application_May 24,2019 <br />