My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-05-20_PERMIT FILE - M2019008
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019008
>
2019-05-20_PERMIT FILE - M2019008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 9:32:29 AM
Creation date
5/22/2019 10:01:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019008
IBM Index Class Name
PERMIT FILE
Doc Date
5/20/2019
Doc Name
Adequacy Review Response
From
McCormick Excavation & Paving
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3.4 Exhibit D — Reclamation Plan <br /> 1. If any reclamation is needed, which I do not know why it would be.There is no overburden to be <br /> removed or vegetation to be disturbed.The operations will be conducted in the creek,away from the <br /> topsoil and vegetation. No haul roads to remove since using farm road of the ranches. <br /> Mining operations will be to remove sand from the creek bottom and in time mother nature will refill <br /> this area with more sand,at that time we can mined it again. But if something needs addressed it will <br /> be done during operations and if any reclamation needs to be done it would commence at the end of <br /> the mining operations. <br /> (a.)There is no overburden to remove.We are removing sand from the creek. So there <br /> Will be no need in stripping or placing any overburden. <br /> (b.)Since there will be no overburden removed.There will be no excavation to get to the sand.We will <br /> Not be needing to slope anything since the sand is at surface and a natural slope will be there. In <br /> Mother nature will fill the area back with sand. <br /> (c.) No top soil is being stripped, nor no overburden disturbed at location. Removal of the sand is <br /> Contained at the area of the creek.There for no seeding will be necessary. <br /> (d.)The creek will still be there,we are not changing any thing with the creek.We are not changing <br /> The route of the creek.All slopes will be left natural, no straight up and down. <br /> (e.)There will be no waste rock, no underground mine openings, ditches and no buildings. <br /> There for there will be no need in the reclamation plan to have these items addressed. <br /> 2. <br /> (a.)There is no overburden to place back in mining area.There is no top soil to place. <br /> There is no seeding to be done.So,there should be no cost in reclamation since <br /> Reclamation will not need to be done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.