Laserfiche WebLink
follow DWR recommendations that we will cover exposed water with 2 feet of sand and raise <br /> our mining up 2 feet to keep water covered. Creek will be mined up stream direction to help <br /> prevent head cutting within the river bed will be contained within the permit boundary. <br /> No sediment or chemical will be in countered. <br /> (j.)Will comply with state water laws and regulation governing existing water rights. We will <br /> Not be impending any water or damming and water. Storm water runoff will not be dammed <br /> Or restricted to flow natural. Storm water will be released to the stream system or infiltrated <br /> Into the ground within 72 hours. <br /> (k.) No refuse or toxic producing materials will be exposed. (I.)There will be hardly any if it all any <br /> disturbance to the hydrologic balance, prevent off-site <br /> damage by not disturbing the natural water flow. By leaving a little sand on the bottom <br /> of the creek bed,this will keep the natural sand protecting the clay bottom creek. <br /> (m.)There will be no processing on site. <br /> (n.)Sand and gravel are the primary commodities to be extracted for agriculture use and <br /> for construction use in road base and sand-based products. No secondary commodities will <br /> be mined. <br /> (o.)Sand gravel will be only mined products.There will be no incidental products mined. <br /> (p.) No explosives will be used in mining or reclamation. <br />