Mr.Lennberg <br /> April 15,2019 <br /> Page 2 of 4 <br /> b.A description of the size and location of each area to be worked during each phase; <br /> PLS Response: Please see the revised Mining Plan Map. Each mining sub-block is approximately <br /> 3 acres with each to be mined within a year, respectively. The timetable is market dependent. <br /> c. Outlining the sequence in which each stage or phase of the operation will be carried out; <br /> PLS Response: Please see the revised Mining Plan Map. The mining will proceed according to <br /> the former mining plan and map with the direction moving west to east in this area at the rate <br /> stated above. <br /> d.The Operator indicated that this area would be used for overburden storage after the cell was <br /> backfilled, approximately how much area will be dedicated to storage?, and <br /> PLS Response: The entire slurry wall cell area of approximately 69 acres will be used for <br /> overburden placement as part of reclamation. The overburden placement sequence will follow <br /> the mining sequence moving west to east, bringing the mining sub-block up to near original <br /> grade as it moves to the next mining sub-block. <br /> e. Once this stage has been reclaimed when will reseeding occur? <br /> PLS Response: Reseeding will occur within a year once the previously mined sub-block in the <br /> slurry wall cell has been brought to near original grade through backfilling and topsoil <br /> placement.This will follow the existing reclamation plan for this area. <br /> 3. Please provide a description of the methods of mining to be employed in the stage of the <br /> operation as required by Rule 6.4.4(a). <br /> PLS Response: The mining method has not changed. The slurry wall cell will be pumped out to <br /> remove all remaining groundwater and mined via open pit dry mining. <br /> 4. Please describe how the initial dewatering of the cell will be performed? <br /> PLS Response: Upon completion of the slurry wall cell. A pit will be mined to the bedrock to <br /> allow for placement of pump(s) to remove the captured groundwater and to discharge to the <br /> nearby existing ponds and channel. Please note, approval of a revised SWSP to reflect this <br /> action will be required as well. <br /> 5.What is the approximate depth to groundwater at the site? <br /> PLS Response: The groundwater is about 7 to 11 feet below ground surface. <br /> 6. If the ponds are relocated will they be the same size as the existing ponds? <br />